My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Design Report Addendum No.2 <br />Pipeline Length <br />Route 2 is approximately 10,773 feet in length. <br />Public Inconvenience & Safety <br />Minor public inconveniences will occur within Route 2 when constructing along the roadway due to <br />equipment placement, work vehicles, etc. The beginning of Route 2 will require that an easement be <br />obtained from the Newport Beach Golf Course. The majority of the route is within ROW and will require <br />maintenance of traffic (MOT). When possible, a trenchless method of construction will be used to cross <br />major intersections to minimize lane closures along the route. <br />Right of Way Availability <br />Route 2 utilizes existing rights -of -way along the majority of the route. The following properties will need <br />permanent construction easements acquired from private landowners: <br />• Newport Beach Golf Course, 20 feet wide by 550 feet long <br />• 2765 Newport Blvd, 20 feet wide by 50 feet long <br />Operation and Maintenance <br />This section will be addressed upon the completion of the hydraulic calculations of the preferred <br />alternative routes. <br />Special Construction <br />Trenchless construction techniques will be used for all pipeline crossings of major highways to avoid <br />disruption in vehicular traffic. Route 2 contains three crossings which will require special coordination <br />and involvement with the applicable agencies. <br />• Delhi Channel (HDD), 300 feet, 30 feet deep <br />• Newport Beach Golf Course (HDD) to 1731 Orchard Drive, 600 feet, 10 feet deep <br />• Santa Ana Avenue (jack and bore), 150 feet, 10 feet deep <br />• Newport Blvd (HDD), 500 feet, 40 feet deep <br />HDD and jack and bore construction will be used to accomplish these major highway crossings. <br />Additional information regarding the estimated cost of special construction is located in Exhibit B. <br />Route 3 <br />The limits of Route 3 begin at the proposed Delhi Channel Diversion Facility Pump Station and end with <br />the pipeline connection to the manhole upstream of the existing Irvine Boulevard Pump Station, which is <br />an existing system owned and operated by CMSD. Wastewater collected at the Irvine Boulevard Pump <br />URS 21 <br />25F -153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.