My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Design Report Addendum No.2 <br />possible, a trenchless method of construction will be used to cross major intersections to minimize lane <br />closures along the route. <br />Right of Way Availability <br />Route 1 utilizes existing rights -of -way along the majority of the route. The following properties will need <br />permanent construction easements acquired from private landowners: <br />• Newport Beach Golf Course, 20 feet wide by 250 feet long <br />• 20321 -20371 Irvine Avenue, 20 feet wide by 400 feet long (this study consider existing sanitary <br />easement per OC parcel map no. 89 -128) <br />• 2765 Newport Blvd, 20 feet wide by 50 feet long <br />Operation and Maintenance <br />This section will be addressed at the completion of the hydraulic calculations of the preferred alternative <br />routes. <br />Special Construction <br />Trenchless construction techniques will be used for all pipeline crossings of major highways to avoid <br />disruption in vehicular traffic. Route 1 contains three crossings, which will require special coordination <br />and involvement with the applicable agencies. <br />• Delhi Channel (HDD), 300 feet, 30 feet deep <br />• Newport Beach Golf Course, continue through 2031 Irvin Avenue. (HDD), 600 feet, 10 feet deep <br />• Santa Ana Avenue (jack and bore), 150 feet, 10 feet deep <br />• Newport Blvd (HDD), 500 feet, 40 feet deep <br />Directional Drilling, and Jack and bore construction will be used to accomplish these major highway <br />crossings. Additional information regarding the estimated cost of special construction is located in <br />Exhibit B. <br />Route 2 <br />The limits of Route 2 are similar to Route 1, beginning at the proposed Delhi Channel Diversion Facility <br />Pump Station and ending with the pipeline connection to the existing OCSD's 27" diameter trunk main <br />through an existing manhole at the east side of Fairview Road near Fair Drive intersection. This route <br />begins at the proposed diversion facility location and proceeds west to cross under the Delhi Channel and <br />continues southwest along the Delhi Channel within the Newport Beach Golf Course. The route continues <br />to northeast to Orchard Drive ROW then crossing to Santa Ana Avenue ROW. The route continues south <br />within the Santa Ana Avenue ROW to Mesa Drive, then continues west within the Mesa Drive ROW, <br />crossing Santa Ana Avenue to Newport Boulevard ROW, and then crossing Newport Boulevard through <br />the bridge's existing utility crossing structures, and continues west to Fair Drive ROW and ends at an <br />existing manhole east of Fairview Road. <br />URS 20 <br />25F -152 <br />
The URL can be used to link to this page
Your browser does not support the video tag.