My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Design Report Addendum No.2 <br />Birch Street at Quail Street and Dove Street, all of which are close to John Wayne Airport. The beginning <br />of Route 4 will require an easement to be obtained from Newport Beach Golf Course. The majority of the <br />route is within ROW and will require maintenance of traffic (MOT). When possible, a trenchless method <br />of construction will be used to cross major intersections to minimize lane closures along the route. <br />Right of Way Availability <br />The OC Public Works land use records indicate that a portion of Birch Street parallel to Campus Drive is <br />within a private tract (from Bristol Street N. to Dove Street, OC Tract No. 3201), and therefore Route 4 <br />goes along Campus Drive for the majority of the route. The following properties will need permanent <br />construction easements acquired from private landowners: <br />• Newport Beach Golf Course, 20 feet wide by 1,000 feet long <br />Operation and Maintenance <br />This section will be addressed upon the completion of the hydraulic calculations of the preferred <br />alternative routes. <br />Special Construction <br />Trenchless construction techniques will be used for all pipeline crossings of major highways to avoid <br />disruption in vehicular traffic. Route 1 contains three crossings which will require special coordination <br />and involvement with the applicable agencies. <br />• Newport Beach Golf Course (HDD), 1,000 feet, 10 feet deep <br />• Campus Drive. (jack and bore), 150 feet, 10 feet deep <br />• Birch St. (jack and bore), 60 feet, 10 feet deep <br />HDD and jack and bore construction will be used to accomplish these major highway crossings. <br />Additional information regarding the estimated cost of special construction is located in Exhibit B <br />Route 5 <br />The limits of Route 5 begin at the proposed Delhi Channel Diversion Facility Pump Station and end with <br />the pipeline connection to the existing OCSD's 15" diameter trunk main at the intersection of MacArthur <br />Boulevard and Campus Drive. This route begins at the proposed diversion facility location and proceeds <br />north across Newport Beach Golf course to Bristol Street SE ROW, crossing Corona Del Mar Freeway <br />using an existing utility crossing structure, and continues northeast on Campus Drive within the ROW. <br />The route continues northeast within the Campus Drive ROW to MacArthur Blvd, ending at an existing <br />manhole on the northwest corner of the intersection of MacArthur Boulevard and Campus Drive. <br />Pipeline Length <br />Route 5 is approximately 7,566 feet in length. <br />Public Inconvenience & Safety <br />The public inconveniences within Route 5 when constructing along the roadway include the major <br />crossings of the Corona Del Mar Freeway (including Bristol Street S. and Bristol Street N). Campus <br />Drive is on the premises of John Wayne Airport. The beginning of route 5 will require an easement to be <br />UR.S 24 <br />25F -156 <br />
The URL can be used to link to this page
Your browser does not support the video tag.