Preliminary Design Report Addendum No.2 <br />5.0 COST EVALUATION <br />In this section, the alternatives developed for the Delhi Diversion Facility have been evaluated for cost - <br />effectiveness. The conceptual costs include capital, and operation and maintenance costs. Capital costs <br />were considered for the Diversion Facilities, conveyance piping and pump stations. <br />5.1 CAPITAL COSTS <br />The original estimated costs of the Urban Discharge Water Diversion System that was presented in the <br />Santa Ana Delhi Channel Diversion Project, Preliminary Design Report Dated July 31, 2012, which <br />incorporated a new pump station and force main, were approximately $3,430,500. The PDR addendum <br />No. 1 dated August 2014 had an estimated cost of $3.7 M. <br />The estimated construction costs for the Santa Ana Delhi Diversion and Treatment System are presented <br />below: <br />Option A — In- channel structure Rubber Dam, Force Main Route 3 <br />Option B - In- channel structure Rubber Dam, Force Main Route 5 <br />Option C — In- channel structure Radial Gates, Force Main Route 3 <br />Option B - In- channel structure Radial Gates, Force Main Route 5 <br />The estimated cost has been revised based on several updates. The original cost estimate for radial gates <br />was $250,000 and has revised to $970,000. Cost for four water storage tanks of $184,000 which were <br />added to the updated version. It is also critical that if the golf course will not be able to accept the <br />harvested flow for irrigation, then all the harvested dry- weather flow will have to be pumped to OCSD <br />trunk main. Subsequently, an increased cost of $961,000 for the 8" FM routing to the nearby CMSD <br />sewer connection location increases the cost of the FM routing to the OCSD trunk main to $2,060,000. <br />This is a significant increase compared to $1,125,000 for the Addendum No. 1 cost estimate for the 4" <br />FM. <br />Table 4- 5 Cost Estimates for Four Alternative Options <br />Item # <br />Item Description <br />Estimated Cost <br />1.0 <br />Mobilization (not to exceed 5% of the total contract) <br />$169,000 <br />2.0 <br />Preparation of Construction Management Plan <br />$10,000 <br />3.0 <br />SWPPP maintenance (0.5% of construction cost) <br />$17,000 <br />4.0 <br />Surveying and construction staking (not to exceed <br />2% of the total contract) <br />$67,000 <br />5.0 <br />Permits OCFC, ACOE, Fish & Game, OCSD) <br />$15,000 <br />6.0 <br />Traffic control (5% of construction cost) <br />$169,000 <br />7.0 <br />Clearing and grubbing (5% of Construction Costs) <br />$169,000 <br />8.0 <br />Temporary shoring including removal of top five <br />feet <br />$360,000 <br />9.0 <br />Site unclassified excavation including stockpiling <br />and export <br />$167,000 <br />ults 29 <br />25F -161 <br />