Laserfiche WebLink
Preliminary Design Report Addendum No.2 <br />Item # <br />Item Description <br />Estimated Cost <br />10.0 <br />-Site backfill including imported material and <br />compaction <br />$75,000 <br />11.0 A <br />Radial Gate <br />$970,000 <br />11.0 B <br />Rubber Dam <br />$380,000 <br />4-2-.0 <br />Rt sB <br />$9 <br />13.0 <br />Three Chamber Clarifier <br />$495,000 <br />14.0 <br />Water Storage Tank <br />$140,000 <br />15.0 <br />RCP <br />$36,000 <br />15.0 <br />Diversion Pump Station / Disinfection <br />$515,000 <br />16.0 A <br />8" Force Main (Route 3) <br />$961,000 <br />16.0 B <br />8" Force Main (Route 5) <br />$2,060,000 <br />17.0 <br />Demolition <br />$67,500 <br />18.0 <br />1 Electrical <br />$150,000 <br />Option A - Rubber Dam, FM Route 3 <br />Subtotal <br />$3,957,000 <br />10% Contingency <br />$396,000 <br />Design Costs (Engineering, Survey, Environmental, <br />Const. Support) <br />$338,100 <br />Construction Management Costs <br />$514,575 <br />Base Bid <br />$5,206,000 <br />Option B - Rubber Dam, FM Route 5 <br />Subtotal <br />$5,056,000 <br />10% Contingency <br />$506,000 <br />Design Costs (Engineering, Survey, Environmental, <br />Const. Support) <br />$338,100 <br />Construction Management Costs <br />$514,575 <br />Base Bid <br />$6,415,000 <br />Option C - Radial Gates, FM Route 3 <br />Subtotal <br />$4,547,000 <br />10% Contingency <br />$455,000 <br />Design Costs (Engineering, Survey, Environmental, <br />Const. Support) <br />$338,100 <br />Construction Management Costs <br />$514,575 <br />Base Bid <br />$5,855,000 <br />Option D - Radial Gates, FM Route 5 <br />Subtotal <br />$5,646,000 <br />10% Contingency <br />$565,000 <br />Design Costs (Engineering, Survey, Environmental, <br />Const. Support) <br />$338,100 <br />Construction Management Costs <br />$514,575 <br />Base Bid <br />$7,064,000 <br />UR.S 30 <br />25F -162 <br />