Preliminary Design Report Addendum No.2
<br />Item #
<br />Item Description
<br />Estimated Cost
<br />10.0
<br />-Site backfill including imported material and
<br />compaction
<br />$75,000
<br />11.0 A
<br />Radial Gate
<br />$970,000
<br />11.0 B
<br />Rubber Dam
<br />$380,000
<br />4-2-.0
<br />Rt sB
<br />$9
<br />13.0
<br />Three Chamber Clarifier
<br />$495,000
<br />14.0
<br />Water Storage Tank
<br />$140,000
<br />15.0
<br />RCP
<br />$36,000
<br />15.0
<br />Diversion Pump Station / Disinfection
<br />$515,000
<br />16.0 A
<br />8" Force Main (Route 3)
<br />$961,000
<br />16.0 B
<br />8" Force Main (Route 5)
<br />$2,060,000
<br />17.0
<br />Demolition
<br />$67,500
<br />18.0
<br />1 Electrical
<br />$150,000
<br />Option A - Rubber Dam, FM Route 3
<br />Subtotal
<br />$3,957,000
<br />10% Contingency
<br />$396,000
<br />Design Costs (Engineering, Survey, Environmental,
<br />Const. Support)
<br />$338,100
<br />Construction Management Costs
<br />$514,575
<br />Base Bid
<br />$5,206,000
<br />Option B - Rubber Dam, FM Route 5
<br />Subtotal
<br />$5,056,000
<br />10% Contingency
<br />$506,000
<br />Design Costs (Engineering, Survey, Environmental,
<br />Const. Support)
<br />$338,100
<br />Construction Management Costs
<br />$514,575
<br />Base Bid
<br />$6,415,000
<br />Option C - Radial Gates, FM Route 3
<br />Subtotal
<br />$4,547,000
<br />10% Contingency
<br />$455,000
<br />Design Costs (Engineering, Survey, Environmental,
<br />Const. Support)
<br />$338,100
<br />Construction Management Costs
<br />$514,575
<br />Base Bid
<br />$5,855,000
<br />Option D - Radial Gates, FM Route 5
<br />Subtotal
<br />$5,646,000
<br />10% Contingency
<br />$565,000
<br />Design Costs (Engineering, Survey, Environmental,
<br />Const. Support)
<br />$338,100
<br />Construction Management Costs
<br />$514,575
<br />Base Bid
<br />$7,064,000
<br />UR.S 30
<br />25F -162