Laserfiche WebLink
Preliminary Design Report Addendum No.2 <br />Traffic Control 5,980.0 if 8.00 47,900 <br />Year 2008 Subtotal $1,430,000 <br />Mobilization/Demobilization at 6% 1.06 <br />Multiplier from ENRCCI 8815 (2008) to 9552 (2014) 1.08 <br />Effective Multiplier 1.15 <br />Construction Year 2014 Subtotal $1,640,000 <br />Name Type Y= COO Mid ' liee ?014 C nct <br />Ne- ;port Beach Golf Course (HDD). 1.000 feet, 10 feet depth <br />Horizontally Drilled Pipe 2014 257,000 1.00 257,000 <br />Campus Drive (Jack h Bore), 150 feet, 10 feet depth <br />Jack and Bore 2014 268,000 1.00 268,000 <br />Birch St (Jack & Bore). 60 feet. 10 feet depth <br />Jack and Bore 2014 225.000 1.00 x,000 <br />Year 2008 Subtotal $751,000 <br />Year 2014 Total: $2,390,000 <br />25F -236 <br />