My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Preliminary Design Report Addendum No.2 <br />Cost Calculations for Pipe: Santa Ana Delhi Diversion FM Route <br />No.5 <br />Printed date : 06/20/2014 <br />Project year: 2014 <br />The estimated construction cost below, which includes contractor overhead <br />and profit, is for planning purposes only. The output does NOT include <br />contingency, sales tax, or allied costs (design, permitting, construction <br />management, etc. ). <br />Construction Year: 2014 <br />Length: 6566 ft <br />Conduit Type: Force Main <br />Depth of Cover: 6 ft <br />Trench Backfill Type: Imported <br />Disposal Type: No Disposal Cost <br />Manhole Spacing: None <br />Existing Utilities: Complex <br />Dewatering: Minimal <br />Pavement Restoration: Trench Width <br />Traffic: Light <br />Land Acquisition: None <br />Required Easements: None <br />Land Adjustment Factor: King County Average <br />Trench Safety: Standard <br />Pipe Diameter: 8 in. <br />Outer Diameter <br />0.754 ft <br />Trench Width <br />3.48 ft <br />Excavation Depth <br />7.75 ft <br />Complete Surface Rest. Width <br />5.48 ft <br />Unit Costs (Basis 2008) <br />Item <br />Quantity <br />Unit Tint <br />CnO Ttem <br />Cod <br />Excavation <br />6,560.0 <br />CY <br />13.00 <br />85,300 <br />Backfill <br />4,230.0 <br />CY <br />34.00 <br />144,000 <br />Complete Pavement Restoration <br />4,000.0 <br />SY <br />86.00 <br />344,000 <br />Trench Safety <br />102,000.0 <br />SF <br />0.53 <br />54,000 <br />Spoil Load and Haul <br />6,560.0 <br />CY <br />16.00 <br />105,000 <br />Pipe Unit Material Cost <br />6,570.0 <br />If <br />30.00 <br />197,000 <br />Pipe Installation <br />6,570.0 <br />If <br />22.00 <br />144,000 <br />Place Pipe Zone Fill <br />2,220.0 <br />CY <br />34.00 <br />75,600 <br />Existing Utilities <br />6,570.0 <br />if <br />32.00 <br />210,000 <br />Dewateuius <br />6,570.0 <br />If <br />24.00 <br />158,000 <br />25F -237 <br />
The URL can be used to link to this page
Your browser does not support the video tag.