My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tama S. Snow, P.E. <br />Deputy Project Manager <br />Senior Project Engineer, Design of Chloramine Booster Stations at <br />Three Existing Domestic Water Reservoirs, Irvine, CA: Preparing <br />preliminary design report (PDR) for the design of three chloramine <br />booster stations at three existing domestic water reservoirs. PDR includes <br />conducting a site analysis to locate new booster stations, identifying all <br />land acquisitions required, identifying permits necessary and CEQA <br />documents. <br />Senior Project Engineer, Baxter Bioscience, Los Angeles, CA: <br />Conducted Failure Mode and Effect Analysis at existing wastewater <br />treatment plant; conducting workshops, preparing report and making <br />recommendations on prioritizing modifications to undersized wastewater <br />treatment plant. <br />25F -70 <br />Overview <br />Ms. Snow has over 22 years of experience in civil engineering planning, <br />design and construction of water, wastewater and recycled water projects. <br />She has worked on a multitude of projects from the conceptual phase <br />through the construction and operation phases that included such tasks as <br />obtaining grants and loans, hydraulic modeling, preparing master plans, <br />preparing design plans and specifications, and served as the lead technical <br />spokesperson for the Orange County Water District's (OCWD) <br />Areas of Expertise <br />Groundwater Replenishment System's Public Relations Campaign while <br />Civil Engineering Planning, Design and <br />working as a Senior Engineer at OCWD. <br />Construction of Water, Wastewater <br />Project Management Experience <br />and Recycled Water <br />Years of Experience <br />Ms. Snow has managed both small projects and large multi - million dollar <br />projects involving multiple municipalities and subconsultants. She delivers <br />With URS: >2 Years <br />projects on schedule and within budget. <br />With Other Firms: 19 Years <br />Education <br />Planning and Design Experience <br />MS /Engineering /2001 /Cal Poly <br />She has extensive planning and design experience on a multitude of <br />Pomona <br />projects including planning and feasibility studies, pipelines, pump <br />BS /Civil Engineering /1991 /University <br />stations, water reservo rs, and water and wastewater treatment facilities. <br />of California, Irvine <br />She also has experience in promoting recycled water for landscape and <br />BA /Mathematics /1988 /University of <br />industrial applications, preparing industrial engineers reports and drawings <br />California, Riverside <br />to obtain health department approval to convert facilities to recycled <br />water and dual plumbed facilities. <br />Registration /Certification <br />1997 /Professional Civil Engineering/ <br />Project Specific Experience <br />CA/ #056934 <br />Project Manager, Stockdale West Wellhead Equipping and <br />Conveyance Facilities, Bakersfield, CA, Irvine Ranch Water <br />District, 2014 -2015: Project includes the design of wellhead equipment <br />for three deep aquifer wells and pipelines to convey up to 9000 gpm of <br />untreated water to a turn -in into the Central Valley Canal. Prepared <br />preliminary design report, construction drawings and specifications. <br />Design Completion Date December 2014; Construction completion <br />December 2015. <br />Senior Project Engineer, Design of Chloramine Booster Stations at <br />Three Existing Domestic Water Reservoirs, Irvine, CA: Preparing <br />preliminary design report (PDR) for the design of three chloramine <br />booster stations at three existing domestic water reservoirs. PDR includes <br />conducting a site analysis to locate new booster stations, identifying all <br />land acquisitions required, identifying permits necessary and CEQA <br />documents. <br />Senior Project Engineer, Baxter Bioscience, Los Angeles, CA: <br />Conducted Failure Mode and Effect Analysis at existing wastewater <br />treatment plant; conducting workshops, preparing report and making <br />recommendations on prioritizing modifications to undersized wastewater <br />treatment plant. <br />25F -70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.