Tama S. Snow, P.E.
<br />01 ovl�l
<br />Senior Project Engineer, Orange Park Acres Pump Station, Orange,
<br />CA, Irvine Ranch Water District: Prepared technical specifications for
<br />the construction of well head equipment, pump station, wet well, sodium
<br />hypochlorite, ammonia injection systems and pipelines for the Irvine
<br />Ranch Water District.
<br />Senior Project Engineer /Assistant Project Manager, Groundwater
<br />Replenishment System, (Orange County), CA, Orange County
<br />Water District (OCWD) /Orange County Sanitation District, 1997-
<br />1999: Prepared planning and feasibility analysis for the GWR System.
<br />Analyses included determining secondary effluent requirements for the
<br />advanced water treatment plant from project inception through build -out,
<br />financial analysis, developing preliminary pipeline alignments based on
<br />utility conflicts, encroachment penirits and costs, preparing technical
<br />memoranda and overseeing consultant's preparation of environmental
<br />documents and planing and feasibility studies.
<br />Lead Project Engineer, Recycled Water System Expansion, Long
<br />Beach, CA, Long Beach Water Department (LBWD): During
<br />preliminary design phase, developed pipeline alignments, completed
<br />hydraulic model to size pipelines, pump stations and reservoirs and
<br />prepared Preliminary Design Report. During final design phase, prepared
<br />construction drawings and specifications for recycled water pipelines,
<br />pump stations, chlorine contact tanks, and conversion of two potable
<br />water reservoirs to recycled water.
<br />Lead Project Engineer, Recycled Water Program, (Various Cities),
<br />CA, West Basin Municipal Water District (WBMWD): Developed
<br />pipeline alignments, prepared cost estimates, managed multiple contracts
<br />with subconsultants and contractors, reviewed design of pipelines, pump
<br />stations and water reclamation facilities prepared by other consulting
<br />firms. Coordinated activities with consultants, subconsultants, State and
<br />County Department of Health Services and prepared hydraulic model.
<br />Also oversaw cross connection testing with State and County DHS.
<br />Project Manager, Reclaimed Water Feasibility Study, Compton, CA,
<br />Central Basin Municipal Water District (CBMWD): Identified
<br />potential reclaimed water users, developed pipeline alignments and
<br />prepared feasibility report.
<br />Lead Project Engineer, Recycled Water Program, Martinez, CA,
<br />Central Contra Costa Sanitary District (CCCSD): Developed standard
<br />pipeline drawings and specifications for recycled water facilities.
<br />Design Engineer, Construction Plans and Specifications, Laguna
<br />Niguel, CA, Moulton Niguel Water District (MNWD): Responsible
<br />for preparation of construction plans and specifications for various
<br />pipeline projects for MNWD. Design included 15,000 linear feet of 8 to
<br />30 -inch potable water pipelines, 32,000 linear feet of 8 to 16 -inch
<br />reclaimed water pipelines and 5,500 linear feet of 8 -inch gravity sewer
<br />pipelines.
<br />25F -71
<br />
|