Laserfiche WebLink
Michael G. Smith, P.E., G.E. <br />Project Engineer, Cajalco Creek Dam and Detention Basin, <br />Riverside County, CA: Prepared alternative designs for mitigating <br />dewatering problems during the construction of the 46 -foot high earthfill <br />embankment. Prepared draft specifications and drawings for stone <br />column foundation improvement and soil- bentonite and cement - <br />bentonite cutoff wall alternatives. <br />Project Engineer, San Joaquin Dam Monitoring and Inspection, <br />Irvine, CA, Irvine Ranch Water District: Performed safety inspections <br />of the San Joaquin Dam and Reservoir in the company of the DSOD <br />inspector. The dam is a 224 -foot high, zoned earth- rockfill embankment <br />with a crest length of 873 feet. <br />Project Geotechnical Engineer, Flow Control Facility and Zone 3 to <br />4 Booster Pump Station, Irvine, CA, IRWD: Performed a geotechnical <br />investigation for the flow control facility and booster pump station. The <br />investigation consisted of soil borings, geotechnical laboratory testing, <br />foundation recommendations and geotechnical report. <br />25F -79 <br />