Areas of Expertise
<br />Civil Engineering
<br />Climate Change Adaptation
<br />Drainage Design
<br />Environmental Engineering
<br />Green Infrastructure /LID
<br />Hydrologic and Hydraulic Analysis
<br />_ _ _ Stormwater_Quality Management
<br />Stormwater Permitting
<br />Sustainability Rating Systems
<br />Total Water Management Planning
<br />Water /Wastewater Treatment
<br />Years of Experience
<br />With URS: 1.5 Years
<br />With Other Firms: 6 Years
<br />Education
<br />MS /Civil and Environmental
<br />Engineering /2009 /Stanford University
<br />BS /Civil Engineering /2007/
<br />Northeastern University
<br />BS /Env ronrnental Geology /2007/
<br />Northeastern University
<br />Registration /Certifi cat! on
<br />2011 /Professional Engineer in Civil
<br />Engineering /CA/ C77953
<br />2012 /LEED ®Accredited Professional
<br />with a Neighborhood Development
<br />specialty/ 10492874 -AP -ND
<br />2013 /National Council of Examiners
<br />for Engineering and Surveying Record,
<br />Model Law Engineer/ 52195
<br />2013 /Envision"m Sustainability
<br />Professional
<br />2014 /Qualified Storm Water Pollution
<br />Prevention Plan Developer/
<br />Practitioner/CA/24821
<br />Nathan Chase, P.E., LEED° A.P. N.D., ENV.
<br />S.P., Q.S.D.
<br />Civil Engineer
<br />Overview
<br />Mt. Chase is a registered Civil Engineer with over seven years of
<br />experience in civil and environmental engineering, design, and planning
<br />for water, wastewater, and stormwater projects. He has performed
<br />technical design and planning on a wide range of projects including
<br />reservoirs, detention basins, pump stations, drinking water wells,
<br />blackwater and graywater treatment, rainwater harvesting, stormwater
<br />management, bridge /highway /rail /site drainage, site development,
<br />hydraulic & hydrologic modeling, LEEDO ccrtification, and climate
<br />change adaptation. He is experienced in specialized software applications,
<br />including Autodesk (AutoCAD, Civil 3D, Storm and Sanitary Analysis,
<br />Hydraflow Storm Sewers), Bentley (MicroStation, F1owMaster, InRoads,
<br />PondPack), Esri (ArcGIS and AreHydro), US Army Corps of Engineers
<br />(HEC -RAS, GeoRAS, HEC -HMS, GeoIIMS), and Microsoft (Office
<br />Suite and Project).
<br />Project- Specific Experience
<br />Project Engineer, Shadow Rock Detention Basin Urban Water
<br />Recovery, Rancho Santa Margarita, CA, Trabuco Canyon Water
<br />District, 2013 -2014, $402K: Responsible for performing hydrologic and
<br />hydraulic analyses for the tributary watersheds to Shadow Rock Detention
<br />Basin for the 2 -year and 100 -year return period design storms using the
<br />Advanced Engineering Software package (AES). The analyses included
<br />watershed delineation, rational method modeling, hydrograph
<br />development, and basin routing of the selected design storms. Also
<br />responsible for pump selection calculations and design for a low flow 80
<br />gpm pump and a high flow 215 gpm pump to convey water from the
<br />detention basin to a reservoir in the District's reclaimed water supply
<br />system.
<br />Project Engineer, Orange Park Acres Well No. 1 Wellhead
<br />Facilities, Orange, CA, Irvine Ranch Water District, 2013 -2014,
<br />$5.2M: Responsible for site civil engineering, pump selection and design
<br />for a 2,000 gpm groundwater well, booster pump, and chloramine
<br />disinfection facility that will supply treated groundwater to the Orange
<br />Park Acres service area to meet domestic water demands. The pump
<br />building and calculations were designed to accommodate a future
<br />doubling of the production capacity to 4,000 gpm upon addition of a
<br />second supply well. Developed engineers estimate of probable costs.
<br />Prepared permitting documents and coordinated to obtain approvals from
<br />Orange City Fife Department and City of Orange Water Department.
<br />Project Engineer, Ttampas Lake Reservoir and Dam, Orange
<br />County, CA, Rancho Mission Viejo, 2013 -2014, $51M: Responsible for
<br />preparing plans, reports, design calculations, and construction cost
<br />estimates for converting an existing tailings storage dam to a recycled
<br />S:A] UtKr.fNGAQ, of Sunm Anx Ddhi Di.eulaaAResume \FaiennttedA07 Chnsq Mflun CityofSanmdnaDelhiU'mevsion.d-
<br />25F-80 1
<br />
|