Laserfiche WebLink
Nathan Chase, P.E., LEED® A.P. N.D., ENV. S.P., Q.S.D. <br />water reservoir for Rancho Mission Viejo that would connect to Santa <br />Margarita Water District's infrastructure, including the Chiquita Water <br />Reclamation Plant. Coordinated field investigations and interdisciplinary <br />design groups to develop conceptual design alternatives for 3,000 acre - <br />feet and 5,000 acre -feet reservoir options, including associated <br />improvements to the existing dam and site. <br />Project Engineer, Durfee Avenue Grade Separation, Pico Rivera, <br />CA, Alameda Corridor -East Construction Authority, 2013 -2014, <br />$73.6M: Responsible for preparing the Standard Urban Stormwater <br />Mitigation Plan (SUSMP) for the grade separation project at the junction <br />of Durfee Avenue and the Union Pacific Railroad in the City of Pico <br />Rivera, Los Angeles County. Designed stormwater best management <br />practices (BMPs), including a dry detention basin using Autodesk <br />AutoCAD Civil 3D. <br />Project Engineer, Transfer Station Cover Structure and Site <br />Improvements, Inglewood, CA, City of Inglewood Public Works, <br />2014: Responsible for site civil design and stormwater permitting to <br />obtain a no exposure certification from the State Water Quality Board via <br />retrofits at an open -air waste transfer station in the City of Inglewood. <br />Coordinated a multidisciplinary design team, including architecture, <br />structural engineering, electrical engineering, solar energy design, <br />sustainability / LEED® design, and cost estimating. Led coordination <br />efforts with City departments, including Buildings, Planning, and Public <br />Works. <br />Project Engineer, BNSF /UPRR Mojave Subdivision Tehachapi <br />Rail Improvement, Fern County, CA, Union Pacific Railroad, 2014: <br />Responsible for preparing the Project Registration Documents and <br />construction general permit SWPPP for two rail segments, including a <br />0.37 -mile siding extension and a 1.01 -mile addition of a second track. <br />Project Engineer, Orange County Great Park, Irvine, CA, City of <br />Irvine, 2014: Responsible for updating the master construction general <br />permit SWPPP for the Orange County Great Park and overseeing its <br />implementation, including conducting quarterly stormwater inspections. <br />Project Engineer, Northam Station Storm Water Pollution <br />Prevention Plan, La Mirada, CA, Chevron Environmental <br />Management Company, 2013 -2014: Responsible for preparing and <br />implementing the Project Registration Documents and construction <br />general permit SWPPP for structure demolition, underground pipeline <br />and utility removals, soil remedial actions, excavations, and backfill, <br />compaction, and grading phases of work at a 23 -acre former crude oil and <br />hydrocarbon fuel storage and pumping station. Conducted weekly site <br />inspections and storm event inspections, communicating required follow - <br />up actions to the contractor and owner. <br />25F -81 <br />