My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25F - AGMT - DELHI DIVERSION PROJECT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2014
>
12/16/2014
>
25F - AGMT - DELHI DIVERSION PROJECT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2014 4:17:06 PM
Creation date
12/11/2014 4:08:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25F
Date
12/16/2014
Destruction Year
2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
240
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Joseph Zhao, PhD, P.E. <br />Long Beach Generation Station Wastewater Treatment Plant, Long <br />Beach, CA, 2012 -2013, $1M: Responsible for the 1.2 mgd wastewater <br />treatment plant improvement projects at LBGS, including new VFD <br />forwarding pump station, addition of 40,OOO1b granular activated carbon <br />and 3,000 gallon ion exchange system. Following completion of hydraulics <br />and process evaluation and preliminary design report, completed 30 %, <br />90 %, 100% design, permitting and then bid. Project is currently under <br />construction. <br />Project Engineer, Design Engineering Services for the Treatment <br />Plant Optimization of the Horace P. HincIdey Water Treatment <br />Plant, Redlands, CA, 2012,$12M: Prepared 90% and 100% plan, <br />specification and bid package. The project is to expand the existing <br />treatment processes at Hinckley from 10 mgd capacity to 14.5 mgd. <br />Lead Project Engineer, Water Master Plan Update and Water <br />Distribution System Modeling, Redlands, CA, City of Redlands: <br />Responsible for development of water distribution system hydraulic <br />modeling for City of Redlands's complex water system, including <br />extensive model dynamic calibration and simulation of water quality and <br />blending for different and sources and pressure zones. <br />Lead Project Engineer, Water Distribution System Modeling and <br />IDSE Study, Tiffin, OH, City of Tiffin: Responsible for performing <br />IDSE study for City of Tiffin water distribution system. Calibrated the <br />hydraulic model and performed EPS water quality simulation. Successfully <br />submitted EPA IDSE filing. <br />Project Engineer, Hydraulic Model Update of Pier G, Long Beach, <br />CA, Port of Long Beach (POLB): Responsible for the Port of Long <br />Beach Pier G Development hydraulic modeling. Modeling efforts <br />included demand analysis and allocation for the average day demand, <br />maximum day demand, peak hour demand and fire flow analysis. <br />Lead Project Engineer, Hydraulic Modeling and System Evaluation <br />for City of Norfolk, VA: Responsible for performing hydraulic modeling <br />and pumping schedule optimization at the two treatment plants and the <br />two ground storage tanks with associated pump stations and two elevated <br />water storage tanks. Hydraulic modeling analysis included WTP, tank <br />operation and master meter SCADA data analysis, Extended Period <br />Simulation and multiple scenario comparison. <br />Lead Project Engineer, Alternative Water Supply Study, Hydraulic <br />Modeling, Bay County, FL, Bay County: Responsible for performing <br />surge and hydraulic analysis using Bentley's Hammer and WaterGEMS <br />program. <br />25F -83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.