My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PIKE, ARNIE
Clerk
>
Contracts / Agreements
>
P
>
PIKE, ARNIE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2017 2:40:52 PM
Creation date
3/11/2015 10:38:43 AM
Metadata
Fields
Template:
Contracts
Company Name
PIKE, ARNIE
Contract #
A-2014-278
Agency
City Attorney's Office
Council Approval Date
11/18/2014
Expiration Date
12/31/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowers Museum Access Compliance Survey Report <br />Facility: Bowers Museum Part: interior Floor: Ground Floor <br />Address: 2002 N Main St, Santa Ana, CA 92706 <br />Existing Architectural Barrier <br />Item No. & Name and Proposed Solution <br />Urinal <br />226 • As -Built Description: <br />36" wide clearance in front of accessible urinal not <br />provided when walls or partitions protect more than <br />24" from the front edge of 30" x 48" clear space, <br />• As- Bulit: 29.5" wide <br />24.25" deep <br />• Proposed Solution: <br />Provide 36" clear floor space in front of accessible <br />urinal. Remodel restroom as needed. <br />Codes I Mitigation Info <br />PCODE WE04A <br />ADAAG 4.183 <br />ADA 2010 605.3 <br />CBC 2010 1115B.4.2.3 <br />CBC 2013 11B -605.3 <br />Qty Unit <br />JOB <br />August 27, 2014 Satty Swanson .d re h i to c is, Inc, Project #14048 Survey Data - Page 45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.