Laserfiche WebLink
Chapter 3 <br />Environmental Impact Analysis <br />This chapter summarizes the environmental impacts analyzed in The Met IS /MND, and evaluates <br />additional or new potential environmental impacts that would occur as a result of changes in project <br />features. It also identifies appropriate mitigation measures, as necessary, that would reduce the <br />significance of additional or new potential environmental impacts. <br />3.1 Environmental Resources Found to Have No <br />Impacts or Less- than - Significant Impacts <br />The following resources were found to have eitherno impacts or less- than - significant Impacts in <br />The Met IS /MND: <br />• Aesthetics <br />• Agricultural and Forestry Resources <br />• Cultural Resources <br />• Hazards and Hazardous Materials <br />• Hydrology /Water Quality <br />• Land Use /Planning <br />• Mineral Resources <br />• Population /Housing <br />• Recreation <br />• Utilities /Service Systems <br />The proposed project would continue to develop 284 multi- family residential units with minor <br />modifications to the following project elements: <br />• an increase in the total number of acres developed; <br />• an increase in the number of buildings constructed; <br />• an increase in the total amount of open space; <br />• an increase in the total number of parldng stalls; <br />• a decrease in the amount of grading; <br />• a decrease in the construction duration; and <br />• a change in project site access. <br />Based on the minor changes, it is expected that impacts would remain relatively the same for the <br />resources mentioned above and project changes would not result in additional or new significant <br />impacts that were not previously addressed in The Met IS /MND. Impacts resulting from the <br />proposed project for the resources mentioned above would continue to either have no impacts or, <br />less - than - significant Impacts and would not represent a substantial change from the previous <br />conclusions in The Met IS /MND. <br />The Met at south Coast 3-1 March 2(7L5 <br />Addendum <br />75A -79 <br />