My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO AND AGMT - 800MHZ RADIO SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
55A - RESO AND AGMT - 800MHZ RADIO SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 3:47:28 PM
Creation date
4/30/2015 3:35:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
55A
Date
5/5/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4,61 Manufacture Motorola Fixed Network Equipment <br />Motorola Responsibilities: <br />• Manufacture the Fixed Network Equipment (FNE) necessary for the system based on equipment <br />order. <br />Customer Responsibilities: <br />• None. <br />Completion Criteria: <br />• FNE shipped to the staging facility. <br />4.6.2 Manufacture Non-Motorola Equipment <br />Motorola Responsibilities: <br />• Procure non - Motorola equipment necessary for the system based on equipment order. <br />Customer Responsibilities: <br />• None. <br />Completion Criteria: <br />• Ship non - Motorola manufactured equipment to the field, and /or the staging facility. <br />4,6.3 Ship to Staging (Milestone) <br />Ship all equipment needed for staging to Motorola's factory staging facility in Schaumburg, <br />Illinois [Customer Center for Solutions Integration (CCSi)]. <br />4,6 .4 Stage System <br />Motorola Responsibilities: <br />• Set up and rack the system equipment on a site -by -site basis, as it will be configured in the field. <br />• Cut and label cables according to the approved CDR docLunentation. <br />• Label the cables with to /from information to specify interconnection for field installation and <br />future servicing needs. <br />• Complete the cabling/counecting of the subsystems to each other ( "connectorization" of the <br />subsystems). <br />• Assemble required subsystems to assure system functionality. <br />• Power up, program, and teat all staged equipment. <br />• Confirm system configuration and software compatibility to the existing system. <br />• Load application parameters on all equipment according to input from Systems Engineering. <br />• Complete programming of the Fixed Network Equipment. <br />• Program the approved templates into a radio - programming template tool. <br />• Complete programming of sample Subscriber units. <br />• inventory the equipment with serial numbers and installation references. <br />• Complete system documentation. <br />City of Santa Ana <br />MCC7500 P25 Dispatch Migration and Subscribers <br />02 April 2015 <br />Use or disclosure of this proposal Is subject <br />to the restrictions on the cover page. <br />Motorola Solutions Confidential Restricted Statement of Work 4 -6 <br />55A -116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.