My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO AND AGMT - 800MHZ RADIO SYS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2015
>
05/05/2015
>
55A - RESO AND AGMT - 800MHZ RADIO SYS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2015 3:47:28 PM
Creation date
4/30/2015 3:35:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Police
Item #
55A
Date
5/5/2015
Destruction Year
2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Thud party subsystems may be staged at the manufacturer's facilities and integrated in the field, <br />Customer Responsibilities: <br />• Provide information on existing system interfaces as may be required. <br />• Provide information on room layouts or other information necessary for the assembly to meet <br />field conditions. <br />Completion Criteria: <br />• System staging completed and ready for testing. <br />4.6.5 Perform Staging Acceptance Test Procedures <br />Motorola Responsibilities: <br />• Test and validate system software and features. <br />• Functional testing of standard system features. <br />• Conduct site level testing. <br />• Power -up site equipment and perform standardized functionality tests. <br />• Perform system burn -in 24 hours a day during staging to isolate and capture any defects, <br />Customer Responsibilities: <br />• None. <br />4,6.6 Ship Equipment to Field <br />Motorola Responsibilities: <br />• Pack system for shipment to final destination, <br />• Arrange for shipment to the field. <br />Customer Responsibilities: <br />• None. <br />Completion Criteria: <br />• Equipment ready for shipment to the field. <br />4.6.7 CCSi Ship Acceptance (Milestone) <br />• All equipment shipped to the field.. <br />i r <br />43.1 Develop Templates <br />Motorola Responsibilities: <br />• Motorola assists Santa Ana in defining each console template. Up to four templates will be <br />provided. <br />• Motorola participates in a meeting to finalize any changes among user groups. <br />• Program the approved templates into the consoles. <br />• Program sample radios with approved templates and deliver for Santa Ana evaluation. <br />City of Santa Ana 02 April 2D15 <br />bIC0750D P25 Dispatch Migration and Subscribers Use or disclosure of this proposal is subject <br />to the restrictions on the cover page, <br />Motorola Solutlons Confidential Restrlcted - 55A -117 Statement of Work 4 -7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.