Laserfiche WebLink
Chapter 4 - Site Preparation <br />CHAPTER 4 - SITE PREPARATION <br />Prior to the arrival of equipment for installation on site, all support connectivity specified in the Support <br />Communications and Connectivity section of this document should be installed and in working order. <br />21.2 NETWORK CABLES <br />Prior to the arrival of equipment, all necessary network cables should be in place. Each workstation and server on <br />the network will require at least one network cable. Each cable should be able to reach from the network switch <br />to the location for the workstation or server. The Inform CAD network requires the use of Category 5e or, where <br />applicable, Category 6 network cable with male RS-45 connectors on each end. TriTech can provide network <br />cabling services, however the cable is not covered under the TriTech Software Maintenance and Support <br />Agreement. Please contact your Account Executive (AE) for further details. <br />The customer will purchase any necessary adapters or wall plates to facilitate installation of the network cable. It <br />will be the customer's responsibility to place the cable in walls, floors, ceilings, and through radio console <br />Furniture, The customer may also need a "short" set of cables to be used during training, until the CAD system is <br />moved to its permanent location. Please review the training requirements with your project manager. <br />Inform CAD system, these should be linked through a high speed interconnect cable and not by <br />bridging from port to port with a CAT,5e cable. <br />TriTech requires a secure area for storage and staging of equipment during the installation phase of the project. <br />21.4 TRAINING SCHEDULE <br />User Training schedules will vaty based upon the type of training and the type of application being trained ('i.e., <br />CAI') vs Mobile). Classes are not more than eight (8) hours a day in length. The class size is limited to a <br />maximum of 10 students with no more than two (2) students per workstation. One student per workstation is <br />preferred whenever possible. It is preferred that classes are held during typical business hours, however, special <br />class times/days can be arranged through your project manager on a eases -by -case basis. <br />21.5 TRAINING LOCATION <br />The training classes should be held in a classroom environment that is outside of the live Dispatch Center. <br />Training in the environment of the Dispatch Center proves to be a distraction for both the students and the <br />on -duty personnel. The training room should be secured when not in use. <br />The contents of this material are confidential and proprietary to TriTech Software Systems, Inc. and may not be reproduced, <br />published or disclosed to others without the prior written consent of TriTech Software Systems, Inc. <br />02015 TriTech Software Systems <br />