Laserfiche WebLink
o Following the procedures for System Upgrade <br />o Managing/Reviewing system logs (SQL and Event Logs) <br />f) Review and approve the applicable TCRs. <br />Completion Criteria <br />This task is considered complete when the TriTech Software (list) has been installed on the Client's <br />designated hardware. <br />7.3 Implementation of Inform CAD <br />Inform CAD is implemented through a series of standard steps and process gates. These steps are designed to <br />ensure that the operational needs of the Client are identified, the configurations are verified, and the system <br />is tested to validate the proper functionality of the system prior to deployment. The following describes the <br />implementation process for Inform CAD. <br />7.3.1 Inform CAD System orientation <br />The Inform CAD System Orientation is conducted at the Client's site and led by a TriTech Business Analyst. <br />The duration of the Inform CAD System Orientation is generally between 3 to 4 days and includes a <br />Business Process Review of the Client's operations. This System Orientation can be conducted in <br />conjunction with Inform RMS if purchased together. <br />Some key discovery points for the Inform CAD System Orientation are as follows: <br />a) Work Flow — Understanding the setup for work flow from first receipt of an incident through incident <br />completion. This may include time observing Dispatch Staff and Ride-Alongs with field units. <br />b) Agency Type Setup — The segmentation of operational processes including incidents, units, and call- <br />taker/dispatcher roles and responsibilities. <br />c) Determine the Code File Hierarchy — This is the structural breakdown of the Client's organization <br />as it will be organized within the CAD system, including: jurisdictions, divisions, response areas <br />(reporting districts, beats, etc). <br />d) Review reporting requirements (geographic reporting segmentation and the like). <br />e) Event numbering (Incidents) including master incident numbers, response numbers and case numbers. <br />f) Application Permissions — Aligning the application permission settings with the security policies of <br />the agency, the Client, and the overall System Administrator. <br />It is recommended that the number of attendees in the CAD System Orientation be limited to 15 to allow for <br />more effective communication during the session. Based on the key discovery points during this session, it is <br />necessary that the attendees include individuals who can properly address these key points and make <br />configuration decisions. <br />During the Inform CAD System Orientation session the Business Analyst will facilitate an operational <br />review of Inform CAD by demonstrating various System functionality and start gathering the configuration <br />information. <br />At least two weeks in advance of the orientation, TriTech will provide a System Module Setup (SMS) <br />worksheet and other reference material to the Client to assist in gathering the required Code Files. <br />Information that cannot be produced during the meeting must be sent to TriTech as specified by the mutually <br />agreed upon schedule. <br />24 <br />