My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS -2015
Clerk
>
Contracts / Agreements
>
T
>
TRITECH SOFTWARE SYSTEMS -2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 10:18:10 AM
Creation date
12/22/2015 9:39:05 AM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS
Contract #
A-2015-252
Agency
POLICE
Council Approval Date
11/17/2015
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
Document Relationships
TRITECH SOFTWARE SYSTEMS
(Amended By)
Path:
\Contracts / Agreements\T
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Execution <br />Note: The Client's provision of Code File information is an early Project checkpoint. Remote Web <br />sessions will be scheduled as a follow up to System Orientation to guide the Client through the <br />Code File data collection process. <br />7.3.1.1 TriTech Responsibilities <br />a) Schedule the Inform CAD System Orientation meeting in accordance with the Client's availability and <br />the Project Schedule. <br />b) Prepare and distribute the meeting agendas and documents for Client review or completion two weeks <br />prior to each meeting. <br />e) Conduct the meetings based on the distributed agenda. <br />d) Document the Client's requirements and configuration specifications resulting from the Inform CAD <br />System Orientation discussions. <br />e) Send the System Module Setup worksheet (SMS) and other reference material to the client at least two <br />weeks prior to the scheduled orientation. <br />f) Document and assign owners and due dates to any action items and track all action items to closure. <br />g) Document any gaps between the standard functionality of the System and functionality required by the <br />Purchase Agreement for further analysis and discussion and/or facilitate the change control <br />process. Client requested changes or changes beyond the scope of the Purchase Agreement will be <br />evaluated at this phase, but will have to be evaluated for the potential impact on the Project Schedule and <br />for additional project charges to be paid by the Client. <br />h) Schedule Remote Web sessions as a follow up to System Orientation to guide the Client through the <br />Code File data collection process. <br />i) Produce an Inform CAD System Orientation Report with the key decisions and configuration points as a <br />result of the System Orientation. Review the draft report with the Client and incorporate modifications. <br />j) Prepare and submit a TCR upon completion of relevant activities. <br />7.3.1.2 Client Responsibilities <br />a) Provide adequate facilities to comfortably hold the Inform CAD System Orientation to include a <br />computer projector, whiteboards, and adequate seating. Two projectors are preferred. <br />b) Ensure participation of key stakeholders and decision -makers in the Inform CAD System Orientation <br />process. <br />e) Provide subject matter experts that can explain the communication center's current call flow and agency <br />structure. <br />d) Provide subject matter experts with the ability to gather and provide the data elements used to build <br />Code Files to TriTech. <br />e) Provide subject matter experts that will be able to explain the agency's geopolitical/operational <br />boundaries. This person (or persons) should be able to articulate the specific response requirements that <br />will be built within CAD response plans. <br />f) Provide subject matter experts that will be the "in house" CAD super users, as well as a person or <br />persons that will be responsible for the ongoing maintenance of the CAD Code Files and configuration <br />(CAD Administrator). <br />g) Provide subject matter experts that will be responsible for translating the geopolitical/operational <br />boundaries into data (ESRI shape files) suitable for use within the CAD. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.