My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TRITECH SOFTWARE SYSTEMS -2015
Clerk
>
Contracts / Agreements
>
T
>
TRITECH SOFTWARE SYSTEMS -2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 10:18:10 AM
Creation date
12/22/2015 9:39:05 AM
Metadata
Fields
Template:
Contracts
Company Name
TRITECH SOFTWARE SYSTEMS
Contract #
A-2015-252
Agency
POLICE
Council Approval Date
11/17/2015
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
Document Relationships
TRITECH SOFTWARE SYSTEMS
(Amended By)
Path:
\Contracts / Agreements\T
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
agency scenarios may vary by Agency. The duration of this class may be between four and six (4-6) hours. <br />Training classes will be held between Tuesday, and Friday. The number of students attending the User <br />Training course will be limited to eight (8) students per class. <br />This class will be held at the Client's site. The Client is responsible for providing adequate training facilities, <br />including a conference room with adequate space and seating/conference table space, white board, projector, <br />and computer projector (capable of 1024068 resolution). <br />:Prerequisites; Completion of a Microsoft Windows Tutorial (this may be waived upon demonstrated ability <br />to work with Windows), typing skills of a minimum of 25 words/nvnute and Mobile field user experience. <br />7.5 Integration Testing of Inform CAD, Mobile and Interfaces <br />Once the FAT is concluded for all Subsystems (Inform CAD, Mobile and each of the CAD interfaces) and in <br />preparation for Go Live, TriTech and the Client will conduct a one day Integration Testing. The Integration <br />testing will be conducted based on scenarios, jointly developed and agreed upon by the Client and TriTech <br />that test the call flow from the call creation to disposition in CAD, These scenarios include the Inform CAD <br />and Interfaces that can be tested in the pre -production environment and are scheduled to Go Live at the same <br />time:. A small group of the Client staff ('1-2 dispatchers and 1-2 Mobile field users) should participate in this <br />test with TriTecli. TriTech will work with the Client on defining a set of test scenarios that test the system <br />based on the Client's practices. It is recommended that the Client utilize sample calls from thew legacy <br />System. These scenarios must be signed off prior to commencement of the integration testing. <br />7.6 Implementation of Inform RMS <br />Inform RMS is implemented through a series of standard steps and process gates. These steps are designed to <br />ensure that the operational needs of the Client are identified, the configurations are verified, and the system <br />is tested to validate the proper functionality of the system prior to deployment. The following sections <br />describe the implementation process for Inform RMS. <br />Certain steps in the implementation of the Inform RMS and FBR may need to be sequenced differently, be <br />performed in phases, or be repeated to accommodate the evolution of the Web product. The Parties will <br />review and discuss these steps jointly and incorporate them into the Project Schedule. <br />7.6.9 Inform RMS System Orientation <br />The Inform RMS System Orientation is conducted at the Client's site and led by a TriTech Business Analyst. <br />The duration of the Inform RMS System Orientation is generally between 3 to 4 days and includes a <br />Business Process Review of the Client's operations. Inform RMS System. Orientation <br />Some key discovery points for the Inform RMS System Orientation are as follows: <br />a) Work Flow — Understanding the setup for work flow processes from the field report to the State <br />Submission. This may include time observing Departmental Divisions (such as Records Staff, <br />Investigation, Property and Evidence, and the like) and Ride-Alongs with field units. <br />b) Review reporting requirements (reporting segmentation and the like). <br />c) Event numbering (Incidents) including master incident numbers and case numbers. <br />It is recommended that the number of attendees in the Inform RMS System Orientation is limited to 1, 5 to <br />allow for more effective communication during the session. Based on the key discovery points during this <br />m <br />
The URL can be used to link to this page
Your browser does not support the video tag.