My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICK ENGINEERING - 2016
Clerk
>
Contracts / Agreements
>
R
>
RICK ENGINEERING - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 10:17:54 AM
Creation date
5/31/2016 3:03:20 PM
Metadata
Fields
Template:
Contracts
Company Name
RICK ENGINEERING
Contract #
A-2016-018
Agency
PUBLIC WORKS
Council Approval Date
2/2/2016
Expiration Date
2/3/2018
Insurance Exp Date
8/15/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
METHOD <br />CMU compression to size 8" x 8" x 16" (3 required, ASTM C <br />140) <br />CMU moisture content, absorption & unit weight (6 required, <br />ASTM C 140) <br />CMU linear drying shrinkage (ASTM C 426) <br />CMU grouted prisms (compression test s8" x 8" x 16", ASTM E <br />447 C 1314) <br />CMU grouted prisms (compression test > 8" x 8" x 16", ASTM <br />E 447 C 1314) <br />Masonry core -shear, Title 24 (test only) <br />BRICK <br />Compression (cost for each, 5 required, ASTM C 67) <br />$/TEST <br />45 <br />40 <br />175 <br />180 <br />250 <br />70 <br />S <br />SLAB -ON -GRADE MOISTURE EMISSION KIT <br />Moisture test kit (excludes labor to perform test, ASTM E 1907) 60 <br />Leighton I Fee Schedule <br />METHOD <br />REINFORCING STEEL <br />Rebar tensile test, up to No. 10 (ASTM A 370) <br />Rebar tensile test, No. 11 & over (ASTM A 370) <br />Rebar bend test, up to No. 11 (ASTM A 370) <br />STEEL <br />Tensile strength, 5100,000 pounds axial load (ASTM A 370) <br />Prestressing wire, tension (ASTM A 416) <br />Sample preparation (cutting) <br />SPRAY APPLIED FIREPROOFING <br />Unit weight (Density, ASTM E 605) <br />$/TEST <br />45 <br />100 <br />45 <br />45 <br />150 <br />50 <br />m <br />Other specialized geotechnical and environmental testing & monitoring equipment are available, and priced per site <br />www.leightongroup.com PAGE 3 OF 4 <br />EQUIPMENT, SUPPLIES & MATERIALS <br />$/UNIT <br />$/UNIT <br />1/4" Grab plates <br />5 <br />each <br />Lockable equipment box <br />15 <br />day <br />1/4" Tubing (bonded) <br />0.55 <br />foot <br />Magnahelic gauge <br />15 <br />day <br />1/4" Tubing (single) <br />0.35 <br />foot <br />Manometer <br />25 <br />day <br />3/8" Tubing, clear vinyl <br />0.55 <br />foot <br />Mileage <br />0.575 <br />mile <br />4 -Gas meter (RKI Eagle or similar) <br />120 <br />day <br />Nitrile gloves <br />20 <br />pair <br />Air flow meter and purge pump (200 cc/min) <br />50 <br />day <br />Nuclear moisture and density gauge <br />88 <br />day <br />Box of 24 soil drive -sample rings <br />120 <br />box <br />Pachometer <br />25 <br />day <br />Brass sample tubes <br />10 <br />each <br />pH/Conductivity/Temperature meter <br />55 <br />day <br />Caution tape (1000 -foot roll) <br />20 <br />each <br />Photo -Ionization Detector (PID) <br />110 <br />day <br />Combination lock or padlock <br />11 <br />each <br />Pump, Typhoon 2 or 4 stage <br />50 <br />day <br />Compressed air tank and regulator <br />50 <br />day <br />QED bladder pump w/QED control box <br />160 <br />day <br />Concrete coring machine (6-inch-dia) <br />150 <br />day <br />Resistivity field meter & pins <br />50 <br />day <br />Consumables (gloves, rope, soap, tape, etc.) <br />35 <br />day <br />Slip / Threaded Cap, 2 -inch or 4 -inch diameter, <br />15 <br />each <br />Core sample boxes <br />11 <br />each <br />PVC Schedule 40 <br />Crack monitor <br />25 <br />each <br />Slope inclinometer <br />50 <br />day <br />Cutoff saws, reciprocating, electric (Saws All) <br />75 <br />day <br />Soil sampling T -handle (Encore) <br />10 <br />day <br />Disposable bailers <br />12 <br />each <br />Soil sampling tripod <br />35 <br />day <br />Disposable bladders <br />10 <br />each <br />Stainless steel bailer <br />40 <br />day <br />Dissolved oxygen meter <br />45 <br />day <br />Submersible pump, 10 gpm, high powered <br />160 <br />day <br />DOT 55 -gallon containment drum with lid <br />65 <br />each <br />Grunfos 2 -inch with controller <br />Double -ring infiltrometer <br />125 <br />day <br />Submersible pump/transfer pump, 10-25 gpm <br />50 <br />day <br />Dual -stage interface probe <br />80 <br />day <br />Survey/fence stakes <br />8 <br />each <br />GEM 2000 <br />130 <br />day <br />Tedlar0 bags <br />18 <br />each <br />Generator, portable gasoline fueled, 3,500 watts <br />90 <br />day <br />Traffic cones (s25)I1barricades (single lane) <br />50 <br />day <br />Global Positioning System (GPS) <br />80 <br />day <br />Turbidity meter <br />70 <br />day <br />Hand auger set <br />90 <br />day <br />Tyvek(D suit (each) <br />18 <br />each <br />HDPE safety fence (5100 feet) <br />40 <br />roll <br />Vapor sampling box <br />45 <br />day <br />Horiba U-51 water quality meter <br />135 <br />day <br />Vehicle usage <br />20 <br />hour <br />In-situ level troll 500 (each) <br />90 <br />day <br />VelociCalc <br />35 <br />day <br />In-situ troll 9500, low flow water sampling <br />150 <br />day <br />Visqueen (20'x 100') <br />100 <br />roll <br />Water level indicator (electronic well sounder) <br />60 <br />day <br /><300 feet deep well <br />Well service truck usage <br />200 <br />day <br />Other specialized geotechnical and environmental testing & monitoring equipment are available, and priced per site <br />www.leightongroup.com PAGE 3 OF 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.