My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICK ENGINEERING - 2016
Clerk
>
Contracts / Agreements
>
R
>
RICK ENGINEERING - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 10:17:54 AM
Creation date
5/31/2016 3:03:20 PM
Metadata
Fields
Template:
Contracts
Company Name
RICK ENGINEERING
Contract #
A-2016-018
Agency
PUBLIC WORKS
Council Approval Date
2/2/2016
Expiration Date
2/3/2018
Insurance Exp Date
8/15/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Leighton I Fee Schedule <br />ff9NN&1r11r4*TT1Mb =$W <br />■ <br />Expiration: For all classifications except those subject <br />of Leighton's liability equal to our total fees for a given <br />to prevailing wage, this fee schedule is effective through <br />project. <br />December 31, 2016 after which remaining work will be <br />billed at then -current rates. <br />® Invoicing: Invoices are rendered monthly, payable <br />upon receipt in United States dollars. A service charge <br />■ <br />Proposal Expiration: Proposals are valid for at least <br />of 1%: -percent per month will be charged for late <br />30 days, subject to change after 30 days; unless <br />payment. <br />otherwise stated in the attached proposal. <br />■ Client Disclosures: Client agrees to provide all <br />■ <br />Prevailing Wages: Our fees for prevailing wage work <br />information in Client's possession about actual or <br />are subject to change at any time based upon the <br />possible presence of buried utilities and hazardous <br />project advertised date, and changes in California <br />materials on the project site, prior to fieldwork, and <br />prevailing wage laws or wage rates. Prevailing wage <br />agrees to reimburse Leighton for all costs related to <br />time accrued will include portal to portal travel time. <br />unanticipated discovery of utilities and/or hazardous <br />■ <br />Overtime: Overtime for field personnel will be charged <br />materials. Client is also responsible for providing safe <br />at 1.5 times basic hourly rates when exceeding 8 hours <br />and legal access to the project site for all Leighton field <br />up to 12 hours per 24 hour interval, and 2 times basic <br />personnel. <br />hourly rates when exceeding 12 hours in 24 hours or on <br />■ Earth Material Samples: Quoted testing unit rates are <br />Sunday, and 3 times basic hourly rates on California <br />for soil and/or rock (earth) samples free of hazardous <br />official holidays. <br />materials. Additional costs will accrue beyond these <br />■ <br />Expert Witness Time: Expert witness deposition and <br />standard testing unit rates for handling, testing and/or <br />testimony will be charged 2 times hourly rates listed <br />disposing of soil and/or rock containing hazardous <br />on the previous pages, withh a minimum charge of four <br />materials. Hazardous materials will be returned to the <br />hours per day. <br />site or the site owner's designated representative at <br />additional cost not included in listed unit rates. <br />■ <br />Minimum Field Hourly Charges: For Field Technician <br />Standard turn -around time for geotechnical -laboratory <br />Special Inspectors or Material Testing Services: <br />test results is 10 working days. Samples will be stored <br />for 2 months, after which they will be discarded. Prior <br />4 hours: Cancellation of inspections not canceled by <br />documented notification is required if samples need to <br />4:00 p.m. on preceding day (No charge if <br />be stored for a longer time. A monthly storage fee of <br />cancellation is made before 4:00 p.m. of the <br />$10 per bag and $5 per sleeve or tube will be applied. <br />preceding work day.) <br />Quoted unit rates are only for earth materials sampled <br />8 hours: Over 4 -hour working day, or begins before <br />in the United States. There may be additional cost for <br />noon and extends into afternoon <br />handling imported samples. <br />e <br />Outside Direct Costs: Heavy equipment, <br />■ Construction Material Samples: After all designated <br />subcontractor fees and expenses, project -specific <br />28 -day breaks for a given sample set meet specified <br />permits and/or licenses, project -specific supplemental <br />compressive or other client -designated strength, all <br />insurance, travel, subsistence, project -specific parking <br />"hold" cylinders or specimens will be automatically <br />charges, shipping, reproduction, and other reimbursable <br />disposed of, unless specified in writing prior to the 28 - <br />expenses will be invoiced at cost plus 20%, unless <br />day break. All other construction materials will be <br />billed directly to and paid by client. <br />disposed of after completion of testing and reporting. <br />■ <br />Insurance & Limitation of Liability: These rates are <br />predicated on standard insurance coverage and a limit <br />PAGE 4 OF 4 <br />www.leightongroup.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.