SAMPLE TASK ORDER NO. 1
<br />Between City of Santa Ana and Rick Engineering Company (RICK)
<br />PROJECT: PRIVACY WALL P.S.&E.
<br />GENERAL DESCIPTION OF WORK
<br />The work entails the preparation of plans, specifications, and estimates (PS&E) for the construction of a privacy wall
<br />on Avenue A between Street A and Street B within the City of Santa Ana for an approximate length of 800 If. The
<br />privacy wall height will be between 10' and 16' of exposed height, although we recommend that the exposed height
<br />be limited to 15'-6" whereas a standard Caltrans Masonry Block Wall (B15-1, Trench Footing, and related std. B15
<br />details) can be used, eliminating the need for special structural engineering calculations for a design cost savings.
<br />It is anticipated that the screen wall will provide rear -yard screening for thirteen (13) residences whose access is
<br />from Street C. Even though the screen wall will be located within the public right of way, it is anticipated that the
<br />construction of the screen wall will impact the private properties.
<br />SCOPE OF WORK
<br />1. Project Kick-off, Meetings, and Coordination: RICK will prepare Kick-off meeting agenda, attend/manage
<br />kick-off meeting and follow up with meeting minutes. We propose to have monthly Project Development Team
<br />(PDT) meetings for status and coordination. RICK will prepare agendas and following meeting minutes of each
<br />meeting. Minutes will include action items with responsible party and date due. Included is on-going coordination
<br />with City project manager and staff, and PDT. Included is initial site reconnaissance.
<br />2. Survey: RICK will provide a topographical survey and right way survey. Survey will include topographical
<br />features such as fences, storage sheds, curb, gutter, sidewalks, irrigation facilities, trees, property lines, above
<br />grade utility appurtenances. Ground contours will be generated at 1' contour interval for a scale of 1"20'. It is
<br />assumed that the City will provide letters/authorization from property owners for surveyor access to rear yards.
<br />3. Utility Coordination: We will collect utility record drawings from utility companies/agencies, such as City, County,
<br />SCE, Gas Company, and telecom companies. A log will be created that tracks utility record contact information,
<br />date of request of asbuilts, date of receipt, and project correspondence with utility. The acquired information will
<br />be plotted in a Microstation V8 file for incorporation into the base map. At each level of plan submittal listed below,
<br />our progress plans set will be provided to the affected utility companies/agencies to keep them abreast of project
<br />progress.
<br />4. Base Map: Prepare a base map in Microstation V8 format that includes topographical survey information, right
<br />of way, property lines, and found utility information. Base map will include property title information, such as
<br />APN numbers, legal description (mapping lot numbers), and address. Base map will be used as the background
<br />to the screen wall plans.
<br />5. Geotechnical Materials Testing and Soils Report: A report with proper testing will be performed to check for
<br />ground water elevation, soils bearing capacity, etc. to verify that the Caltrans standard screen wall will suffice
<br />without any special calculations. Structural calculations, if needed, are not included. Two geotechnical borings
<br />are included within the public right of way on the approximate screen wall alignment.
<br />6. Privacy Wall Design Plans: Prepare detailed construction plans for the privacy wall at a scale of 1 "=20' utilizing
<br />the City's standard sheet border with appropriate approval signatures, notes, and details. It is anticipated that
<br />the plans will include a title sheet, notes, typical section and detail sheet, and two (2) plan and profile sheets.
<br />Profile will included top of wall and top of footing profiles. Plan view will depict screen wall horizontal location
<br />information, removals, relocations, avoidance, and base map data. We propose to submit plans at the 35%,
<br />85%, 100% and final levels of completion.