My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RICK ENGINEERING - 2016
Clerk
>
Contracts / Agreements
>
R
>
RICK ENGINEERING - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 10:17:54 AM
Creation date
5/31/2016 3:03:20 PM
Metadata
Fields
Template:
Contracts
Company Name
RICK ENGINEERING
Contract #
A-2016-018
Agency
PUBLIC WORKS
Council Approval Date
2/2/2016
Expiration Date
2/3/2018
Insurance Exp Date
8/15/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. Legal Descriptions and Plats: Included are legal descriptions and plats for Temporary Construction Easements <br />and contractor access easement for each parcel (13 separate properties included). The temporary construction <br />easement plats and legal descriptions will be utilized by the City for work on the private properties. Our work does <br />not include property owner coordination, negotiation nor acquisition services. Included in this item is the preparation <br />of individual property owner (8 '/" x 12" size) exhibits that show the work to be performed on the private property <br />and the impact to their property, such as fence removals, reconstruction of side yard fencing, storage sheds, shade <br />structures, etc. <br />8. Specifications: RICK will prepare technical specifications and special provisions as required to supplement the <br />2012 Edition of the Green Book. It is assumed that the City of Santa Ana will provide a boiler plate specification <br />package as a guideline. The specifications will set forth the method of installation and quality standards for <br />materials and workmanship for the finished product. A Schedule of Bid Items will be prepared consistent with <br />plans. <br />9. Engineer's Estimate: An Engineer's Estimate will be prepared. The unit prices will be based on unit contractor <br />prices provided by the City for recent projects, the latest Caltrans Construction Cost Data for projects of similar <br />magnitude, and/or other in-house sources we have on record from recent projects. <br />10. As -Built Plans: As builts will be prepared in the microstation V8 files based on provided contractor mark-ups, <br />known to the engineer of record, RFI's, and construction changes. Deliverable will be mylars of the project plans <br />and an electronic copy of the project plans in microstation V8 following the City of Santa Ana's CAD standards. <br />Statement of Qualifications to Provide On -Call Engineering Services for the City of Santa Ana <br />
The URL can be used to link to this page
Your browser does not support the video tag.