My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />With the construction of the souind walls the well devellopment activities would <br />result in noise levels that would range from a 01 dB increase to a 0.7 dB <br />increase. As shown in Table 62, the well development activities would not <br />exceed the daytime noise standard. Additionally, the well development activities <br />would be conducted during the day when the construction activity would be <br />exempt under the City's Noise Ordinance. Potential noise impacts would be less <br />than significant. <br />Table 63: MBI-4 Well Development Night Time Noise Levels <br />Receiver <br />Edinger Ave, <br />�xlstlrrg <br />, <br />Existing + <br />Increase <br />Thrpshold <br />7 <br />Single family north <br />676 <br />67.9 <br />0,3 <br />70.6 <br />1 <br />Edinger Ave <br />34.6 <br />34.7 <br />0.1 <br />50.0 <br />8 <br />Multi Family north <br />66-2 <br />7-6 -3 <br />-0.1 - <br />65.2 <br />2 <br />Edinger Ave. <br />54.5 <br />54.5 <br />0.0 <br />57.5 <br />9 <br />North Centennial <br />59.5 <br />59,8 <br />0.3 <br />62.5 <br />3 <br />Education Center <br />58.1 <br />58,1 <br />0,0 <br />6 1 A <br />10 <br />SoutheasE Centennial <br />54,8 <br />54,8 <br />00 <br />550 <br />Education Center <br />-1 <br />Single Family east <br />71.8 <br />71 _8 <br />&C <br />74,8 <br />Fairview Street <br />12 <br />Single Family east <br />71.3 <br />71.3 <br />0.0 <br />74.3 <br />Fairview Street <br />13 <br />Single Family east <br />71.3 <br />71 3 <br />0,0 <br />74.3 <br />Fairview Street <br />Single Family east <br />7t-471.4 <br />0.0 <br />74.4 <br />Fairview Street <br />15 <br />North Godinez High <br />53,13 <br />53.6 <br />0.0 <br />550 <br />School <br />16 <br />Northwest Mitchell <br />43.5 <br />43,7 <br />0,2 <br />55,10 <br />School <br />17 <br />North Heritage MuseUM, <br />48.1 <br />48.3 <br />02 <br />55.0 <br />Structure <br />18 <br />South Godinez High <br />413 <br />433 <br />0.0 <br />55,0 <br />School <br />7-9 <br />Northwest Godinez High <br />46,2 <br />462 <br />0.0 <br />55.0 <br />School <br />I "City Nose standard or Ambient Nome level +3 d8 When Existing Noise Levels Above Culy standard <br />With the construction of the souind walls the well devellopment activities would <br />result in noise levels that would range from a 01 dB increase to a 0.7 dB <br />increase. As shown in Table 62, the well development activities would not <br />exceed the daytime noise standard. Additionally, the well development activities <br />would be conducted during the day when the construction activity would be <br />exempt under the City's Noise Ordinance. Potential noise impacts would be less <br />than significant. <br />Table 63: MBI-4 Well Development Night Time Noise Levels <br />Receiver <br />i Doscriptilain <br />�xlstlrrg <br />, <br />Existing + <br />Increase <br />Thrpshold <br />1 <br />C onstrootlian <br />1 <br />Multi Family west Santa - <br />34.6 <br />34.7 <br />0.1 <br />50.0 <br />Ana River <br />2 <br />Multi Family west Santa <br />54.5 <br />54.5 <br />0.0 <br />57.5 <br />Ana River <br />3 <br />Single Family north <br />58.1 <br />58,1 <br />0,0 <br />6 1 A <br />rrr Mid Basin Centennial Park Injectonigli Project Final EIR 5-187 <br />2 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.