My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />With the construction of the sound walls the well development activities would <br />result in noise levels that would range from a -0,2 dB decrease to a 0,2 dB <br />increase. As shown in Table 63, the construction activity Would not exceed the <br />night time noise standard. Potential noise impacts would be less than significant. <br />Phase 7 Construction Activities <br />Phase 7 construction activities would include: Sound Panel Construction and <br />Removal at the Monitoring Well, Conductor Casing Installation at the Monitoring <br />Well; Borehole Drilling and Reaming at the Monitoring Well; Well Construction at <br />the Monitoring Well; Well Development at the Monitoring Well; and Well <br />Equipping at MBI-2 and MBI-4, <br />Mid Basin Centennial Park �&dnj <br />gbProject Final PIP 5-188 <br />Edinger Ave. <br />4 <br />Single Family north <br />57.0 <br />5'7,0 <br />0.0 <br />60,0 <br />Edinger Ave. <br />5 <br />Single Family north <br />573 <br />57,3 <br />Edinger Ave. <br />6 <br />Single famfly north <br />643 <br />64.4 <br />0.1 <br />67.3 <br />Edinger Ave. <br />7 <br />Single family north <br />601.2 <br />60.4 <br />02 <br />63,2 <br />Edinger Ave. <br />8 <br />Multi Family north <br />58,9 <br />58.9 <br />0.0 <br />61,9 <br />Edinger Ave. <br />9 <br />North Centennial <br />521 <br />51.9 <br />ri <br />-0.2 <br />55.1 <br />Education Center <br />to <br />Southeast Centennial <br />49.2 <br />49.2 <br />O.C) <br />50,0 <br />Education Center <br />A�G <br />11 <br />Single Family east <br />661 <br />60- <br />00 <br />69.7 <br />Fairview Street <br />12 <br />Single Family east <br />66,3 <br />66.3 <br />on. <br />69.3 <br />Fairview Street <br />13 <br />Single Family east <br />663 <br />663 <br />O'G <br />69.3 <br />Fairview Street <br />14 <br />Single Family east <br />66.3 <br />66.3 <br />ad <br />69.3 <br />Fairview Street <br />15 <br />North Godinez High <br />48.4 <br />48.4 <br />D'a <br />50.0 <br />School <br />16 <br />Northwest Mitchell School <br />37.4 <br />37.4 <br />0.0 <br />6o.0 <br />17 <br />North Heritage Museurn <br />42.9 i <br />43.0 <br />0.1 <br />50.0 <br />Structure <br />18 <br />South Godinez High <br />38.2 <br />38.2 <br />0.0 <br />50,0 <br />School <br />19 <br />Northwest Godinez High <br />353 <br />35.4 <br />0 <br />School I <br />I <br />I-City Noise Standard -rAmbenl Morse level try V when ExiMing No),qu Levels Above. CNIy SlffdoW <br />sold -E.Kxa& NnesiSeind.,ird rhrashoM <br />With the construction of the sound walls the well development activities would <br />result in noise levels that would range from a -0,2 dB decrease to a 0,2 dB <br />increase. As shown in Table 63, the construction activity Would not exceed the <br />night time noise standard. Potential noise impacts would be less than significant. <br />Phase 7 Construction Activities <br />Phase 7 construction activities would include: Sound Panel Construction and <br />Removal at the Monitoring Well, Conductor Casing Installation at the Monitoring <br />Well; Borehole Drilling and Reaming at the Monitoring Well; Well Construction at <br />the Monitoring Well; Well Development at the Monitoring Well; and Well <br />Equipping at MBI-2 and MBI-4, <br />Mid Basin Centennial Park �&dnj <br />gbProject Final PIP 5-188 <br />
The URL can be used to link to this page
Your browser does not support the video tag.