My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />6 <br />Sing e I'l north -- <br />643 <br />64.3 <br />01 <br />7C-7-3 <br />Edinger Ave. <br />7 <br />Single Family -north <br />BU <br />60,2 <br />0.0 <br />63.2 <br />Edinger Ave, <br />8 <br />Multi Family north <br />58,9 <br />58.9 <br />0,0 <br />61.4 <br />Edinger Ave, <br />9 <br />North Centennial <br />521 <br />52.1 <br />00 <br />551 <br />EdLIGatl ©n Center <br />10 <br />Southeast Centennial <br />49.2 <br />49.3 <br />0.0 <br />50.0 <br />Education Center <br />11 <br />Single Family east <br />66.7 <br />66.7 <br />00 <br />693 <br />Fairview Street <br />12 <br />Single Family east <br />66.3 <br />663 <br />0.0 <br />69.3 <br />Fairview Street <br />-3 <br />Single Family east <br />66.3 <br />66.3 <br />0,0 <br />69.3 <br />Fairview Street <br />14 <br />Single iEenroy -east <br />-66.3 <br />66.3 <br />0,0 <br />69,3 <br />Fairview Street <br />15 <br />North Godinez High <br />48.4 <br />48.4 <br />9,0 <br />50.0 <br />School <br />Northwest Mitchell <br />37,4 <br />45,2 <br />7.8 <br />50.0 <br />School <br />17 <br />North Heritage <br />42.9 <br />50.1 <br />7.2 <br />50.0 <br />Museum Structure <br />18 <br />South Godirraz High <br />381 <br />50.7 <br />12.5 <br />50.0 <br />School <br />19 Northwest -Godinez 35.3 36.2 0.91 50.0 <br />High School 11 <br />1-Giry Nuse, Standard or Arnhei Noise level 13 d8 Whon rvi.Onq Noise LevP19 AhaWe C,'.Iy Stai,daed <br />Baba' lTyceeds Noise Standard ThreshnId <br />With the construction of the sound walls the well borehole drilling activities would <br />result in noise levels that would range from a 0.1 dB increase to a 12.5 dB <br />increase. As shown in Table 67, the construction activity would exceed the night <br />time noise standard at Receptors 17 and 18 by less than 1 dB. The construction <br />activity would occur at night when school is not session at Godinez High School <br />and when no sensitive receptors would be at the Heritage Museum. Because no <br />sensitive receptors would be present potential noise impacts would be less than <br />significant. <br />Monitoring Well Construction <br />The well construction activities would be required to occur 24 hours per day 7 <br />days a week until completion. The duration of the well construction activities <br />would be 3 days, Table 68 and Table 69 show the noise l�evels during the day <br />and night when well construction would be occurring. <br />Mid Basin Centennial IPark 1� anj 1, roject Final EIR 5-193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.