Laserfiche WebLink
Section 5 <br />Table 68-. Monitoring Well Construction Day Time Noise Levels <br />Receiver <br />Description <br />Existing <br />ExJisting + <br />Increase <br />Tbreshold <br />Construction <br />Multi Family west <br />41;.8 <br />41.9 <br />QA <br />55.0 <br />Santa Ana River <br />Multi Family west <br />61.9 <br />61.9 <br />U <br />64.9 <br />Santa Ana River <br />3 <br />Single Family north <br />65.6 <br />656 <br />0.0 <br />68,6 <br />Edinger Ave. <br />4 <br />Single Family -north <br />64.4 <br />64.4 <br />0.0 <br />67.4 <br />Edinger Ave, <br />5 <br />Single Family north <br />647 <br />64.7 <br />0,0 <br />67.7 <br />Edinger Ave. <br />6 <br />Single family north, <br />71,7 <br />717 <br />0.0 <br />74.7 <br />Edinger Ave. <br />7 <br />Single family north <br />67.6 <br />67,6 <br />Oc <br />70.6 <br />Edinger Ave. <br />8 <br />Multi Family north <br />66.2 <br />66.2 <br />0.0 <br />69.2 <br />Edinger Ave. <br />9 <br />North Centennial <br />59,5 <br />59,5 <br />00 <br />62,5 <br />Education Center <br />Southeast Centennial <br />54.8 <br />54.13 <br />0.0 <br />55.0 <br />Education Center <br />11 <br />Single Family Bast <br />71.8 <br />71.8 <br />0.0 <br />74.8 <br />Fairview Street <br />12 <br />Single Family east <br />71.3 <br />71.3 <br />O'D <br />74.3 <br />Fairview Street <br />13 <br />Single Family east <br />71.3 <br />71.3 <br />0,0 <br />743 <br />Fairview Street <br />14 <br />Single Family east <br />71 A <br />71.4 <br />0.0 <br />74.4 <br />Fairview Street <br />15 <br />North Godinez High <br />53.6 <br />53.6 <br />0.0 <br />566 <br />School <br />16 <br />Northwest Mitch-ell <br />43.5 <br />46.5 <br />3.0 <br />55.0 <br />School <br />17 <br />North Heritage <br />481 <br />511 <br />3,0 <br />55'0 <br />Museum Structure <br />is <br />South Godinez High <br />43,3 <br />51.9 <br />7.6 <br />55.0 <br />School <br />19 <br />Northwest Godinez <br />46,2 <br />46.4 <br />0,2 <br />55.0 <br />High School <br />I .... .. <br />Bold Stan Jar, Thre?,N)Iil <br />With the construction of the sound walls, the construction of the monitoring well <br />would result in noise levels that would range from a 01 dB increase to a 7.6 dB <br />increase. As shown in Table 68, the construction of the monitoring well would not <br />Mid Basin Centennial Park Injection Well Project Final EIR 5-194 <br />25C-295 <br />