My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 5 <br />6 <br />Single fa m01 yno north <br />71,8 <br />01 <br />74,7 <br />Edinger Ave. <br />7 <br />Single family north <br />67.6 <br />677 <br />01 <br />70,6 <br />Edinger Ave. <br />8 <br />Multi Family north <br />062 <br />66.3 <br />0.1 <br />692 <br />E6nger Ave. <br />9 <br />North Centennial <br />59.5 <br />59.1 <br />-0.4 <br />62,5 <br />Education Center <br />10 <br />Southeast Centennial <br />548 <br />54.6 <br />J'a <br />55,0 <br />Education Center <br />11 <br />Single Family east <br />71.8 <br />J 71.8 <br />00 <br />74.8 <br />Fairview Street <br />I <br />Single Family east <br />71.3 <br />71.3 <br />0.0 <br />74.3 <br />Fairview Street <br />t3 <br />Single Family east <br />71.3 <br />71.3 <br />0.0 <br />74,3 <br />Fairview Street <br />14 <br />Single Family east <br />71 A <br />71.4 <br />0.0 <br />74.4 <br />Fairview Street <br />"15 <br />North Godinez High <br />53,6 <br />53.6 <br />0-.0 <br />55,0 <br />School <br />16 <br />Northwest WOO <br />415 <br />416 <br />0.1 <br />55.0 <br />School <br />17 <br />North Heritage <br />48.1 <br />52.1 <br />D'O <br />55.0 <br />Museum Structure <br />18 <br />South Godinez High <br />43.3 <br />43.3 <br />1 <br />55.0 <br />School <br />19 <br />Northwest Godinez <br />46,2 <br />46.5 <br />0.6 <br />55,10 <br />High School <br />1-Fitly Noise Standard or Ambient Wise level F3 dS VVhen EXIMIM9 Naive Levels Aho", r1le3laf7d-arri <br />Bold =Excee,,ds Noise Standard Thresheld <br />With the construction of the sound walls, the well equipping would result in noise <br />levels that would range from a -0.4 dB decrease to a 1.4 dB increase. As shown <br />in Table 72, the well equipping would not exceed the City's day time noise <br />standard. Additionally, the well equipping would occur during the day when the <br />construction activity would be exempt under the City's Noise Ordinance. Potential <br />noise impacts would be less than significant. <br />Phase 8 Construction Activities <br />The Phase 8 construction activities would include: Well Equipping at MBI-3; Well <br />Equipping at MBI-5; Paving Centennial Park's roads and parking lots; and Skate <br />Park fence and camera improvements. Since all four activities have the potential <br />to occur simultaneously with any of the other construction activities in Phase 8, <br />all four activities have been analyzed together and the noise impacts are shown <br />in Table 73. Ail construction activities associated with the well equipping, paving, <br />and Skate Park improvements would occur during the day, <br />Mid Basin Centennial Park �662kbi Project Final EIR 5-199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.