Laserfiche WebLink
Section 5 <br />Table 73: MBI-3and MBI.5 Well Equipping, Paving and Skate Park Day Time <br />Noise Levels <br />Receiver <br />Description <br />Existing <br />Existing + <br />increase <br />Threshold <br />Construction <br />1 <br />Mull! Family west Santa <br />41.8 <br />44.2 <br />2.4 <br />55.0 <br />Ana River <br />2 <br />Multi' Family west Santa <br />61 9 <br />62:0 <br />01 <br />64.9 <br />Aria River <br />3 <br />Single Family north Edinger <br />65.6 <br />65.6 <br />0,0 <br />68,6 <br />Ave. <br />4 <br />Single Family north Edinger <br />64.4 <br />64.6 <br />0.2 <br />67.4 <br />Ave, <br />5 <br />Single Family north Edinger <br />647 <br />64.9 <br />U <br />67.7 <br />Ave. <br />6 <br />Single family north Edinger <br />717 <br />71.7 <br />0.0 <br />74.7 <br />Ave, <br />7 <br />Single family north Edinger <br />67,6 <br />676 <br />0.0 <br />7'0.6 <br />Ave, <br />8 <br />Multi Family north Edinger <br />66.2 <br />66.3 <br />0.1 <br />69.2 <br />Ave. <br />1 <br />9 <br />North Centennial Education <br />59.5 <br />59,6 <br />0.1 <br />62.5 <br />Center <br />10 <br />Southeast Centennial <br />54.8 <br />63.5 <br />8.7 <br />55.0 <br />Education Center <br />11 <br />Single Family east Fairview <br />71 _8­7T9- <br />0 1 <br />74,8 <br />Street <br />12 <br />Family east Fairview <br />71.3 <br />71.5 <br />0.2 <br />74.3 <br />Street <br />13 <br />Single Family east Fairview <br />71.3 <br />71.5 <br />0.2 <br />74.3 <br />Street <br />14 <br />Single Family east Fairview <br />71 A <br />71 A <br />0,0 <br />74.4 <br />Street <br />Is <br />North Godinez High <br />53.6 <br />56.7 <br />2.1 <br />55.0 <br />School <br />16 <br />Northwest Mitchefl School <br />43.5 <br />442 <br />0.7 <br />55.0 <br />17 <br />North Heritage Museum <br />48 .1 <br />49.1 <br />59.0 <br />Structure <br />18 <br />South Godinez High School <br />43.3 <br />43.4 <br />0.1 <br />55.0 <br />19 <br />Northwest Godinez High <br />46.2 <br />50.7 <br />4,5 <br />55.0 <br />School <br />1 =City Noise Standard or Ambient Noise ImvmV k3 dO Wirem Exiving Noise LovWs Above Cia Standard <br />8.10 -E=aads Wjis,. Standard Threshdd <br />With the construction of the sound walls the construction activities would result in <br />noise levels that would range from a 0-1 dB increase to 83 dB increase. As <br />shown in Table 73 the construction activities would exceed the City's day time <br />noise standard at Receptor 10 and 15. Title construction activities would occur <br />Mid Basin Centennial Park 2 In 3 <br />jec on Well Project Final EIR 5-200 <br />6-01 <br />