Laserfiche WebLink
Section 5 <br />Table 92: Weekday Available Parking with Well Equipping Activities <br />Parking <br />Area <br />Available <br />Parking <br />S' acces <br />(1), Average <br />Occupancy <br />surplus <br />Spaces <br />(2)Maxlmum <br />Reduced <br />Spaces <br />Not Available <br />parking <br />- <br />1 <br />132 <br />17 <br />115 <br />14 <br />+101 <br />2 <br />32 <br />23 <br />9 <br />10 <br />-1 <br />3 <br />86 <br />82 <br />4 <br />0 <br />+4 <br />4 <br />322 <br />313 <br />9 <br />12 <br />1 <br />-3 <br />5 <br />145 <br />115 <br />30 <br />__+4,18 <br />t12 <br />WDIWC <br />(I A,er.ged over 4 d., eurvrep period <br />r2) As,n,,,s lvlgelirlun R,,fteed Pwk ... i,lurin Well Phase <br />Table 91 and 92 show that there would be a shortage of parking spaces at <br />Parking Areas 2, 4 and 5. The well drilling/well construction/development and <br />well equipping activities would be phased at different locations and at different <br />times of the year to free up available parking at other parking areas. Table 93 <br />identifies the time of year where a specific type of construction activity would <br />occur. <br />Table 93: Well Construction Phasing <br />Month <br />Parking <br />Parking <br />Parking <br />Parking <br />Parking <br />Occurring <br />Area 1 <br />Area 2 <br />Area I <br />Area 4 <br />Area 5 <br />Date <br />Dec-Jan <br />WDIWC <br />2018 <br />Jari-Feb <br />WDV <br />WDIWC <br />2018 <br />Mar-Apr <br />WD/WC <br />WDV <br />2618 <br />Apr May <br />WDV <br />WD/WIC <br />2018 <br />Jun-July <br />WDV <br />2018 <br />July-Oct <br />WE <br />WE <br />2018 <br />Oct -Jan <br />WE <br />WE <br />2019 <br />Aodwijes Usted in same row are arcurfing cmcutrerrry <br />WD= Welling Oulling '1.5 maaths <br />WC' -Well Cnnslrrfion 1.5 months <br />oVDV4Vell Development 1.5 rionths <br />WE-Wefl Egmpping 3 months <br />j Mid Basin Centennial Park lugenfleroject Final EIR 5-235 <br />