My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 8 <br />localized emissions of NOx, CO, PIv110 and PM2 5 would be less than the <br />SCAQMD "s localized significance thresholds. <br />Table 100: Proposed Project Localized Construction Emissions. <br />Construction Activity <br />Emissions 1Poundslltkayp <br />NOx <br />Co <br />PMpe <br />it <br />Phase 1- Install pipeline <br />Build Shared Structures <br />Improve Heritage sate <br />Project maximum daily on -site <br />81 <br />64 <br />7' <br />2 <br />emissions <br />4 <br />51 <br />48 <br />3 <br />SCAOMD screening <br />83 <br />753 <br />12 <br />4 <br />Thresholds <br />2 <br />Phase 3 -4 -5- Well <br />Development <br />2 <br />30 <br />Exceed Threshold? <br />No <br />No <br />No <br />No <br />NO = nitrogen Lxjdcws C0 = carban monoxide Ph1m and PMzs'= paNin late riallur <br />Notes: <br />5aure.e nP Irrreslnoltls: SOIIM Uaasi Air OUality Manage rnmi Disttict 2Yr9, iar SRA 22, 500 meters, 1 -acre. site. <br />Proposed Project Construction - Generated Regional Air Pollutants <br />Regional emissions include those generated from alll onsite and offsite activities. <br />Regional significance thresholds have been established by the SCAQMD <br />because emissions from projects in the Basin can potentially contribute to the <br />existing emission burden and possibly affect the attainment and maintenance of <br />ambient air quality standards. As shown in Table 101 Proposed Project regional <br />emissions of NOx, CO, PM10 and PM2.5 would be less than the SCAQMD's <br />localized significance thresholds. <br />Table 101: Proposed Project Estimated Maximum Daily Construction <br />Emissions (Pounds /Day) <br />Phase <br />%ioC <br />NOx <br />Co <br />PM10 <br />Pil <br />Phase 1- Install pipeline <br />Build Shared Structures <br />Improve Heritage sate <br />1 <br />17 <br />17 <br />3 <br />1 <br />Phase 2- Well Drillings <br />4 <br />51 <br />48 <br />3 <br />2 <br />Phase 3 -4 -5 -Well Drilling <br />4 <br />51 <br />48 <br />3 <br />2 <br />Phase 3 -4 -5- Well <br />Development <br />2 <br />30 <br />17 <br />1 <br />1 <br />Total Phases 3 -4 -5 <br />6 <br />82 <br />65 <br />4 <br />3 <br />Phase 6- Weil Development <br />2 <br />30 <br />17 <br />1 <br />1 <br />Phase 7- Well <br />4 <br />51 <br />48 <br />3 <br />2 <br />Mid Basin Centennial Park j c&n bProject Final EIR 8 -14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.