Laserfiche WebLink
Section 8 <br />C?rilling /Development <br />Vic <br />NOx <br />Co <br />PMIO <br />PM2.5: <br />Phase 7- Monitoring Well <br />Equipping <br /><0.5 <br />7 <br />5 <br /><0 5 <br /><0.5 <br />Total Phase 7 <br />5 <br />58 <br />53 <br />3 <br />3 <br />Phase 8- Well Equip /Paving <br />3 <br />20 <br />22 <br />a <br />2 <br />Significance Threshold <br />7'5 <br />1 100 <br />1 550 <br />150 <br />55 <br />Significant Impact? <br />No <br />No <br />No <br />No <br />No <br />Skalo nark conv=t'*n amissaons wo(00 he negllghe campared la the well.dr(IIInt7 and equipping emissnans, end are no &hewn. <br />SOLD value exceeds SCAOMD threshold <br />Sue Appsxndix 8 6orCaIMMod Nadel Wrir, . <br />Proposed Project Operation- Generated Regional air Pollutants <br />Operational emissions would be generated by the proposed Project from <br />maintenance activities conducted at the injection well sites. As shown in Table <br />102 Project operational emissions of NOx, CO, PMI Q and PM2 5 would be less <br />than the SCAQMD's localized significance thresholds. <br />Table 102: Proposed Project Regional Operational Emissions <br />Phase <br />Vic <br />NOx <br />Co <br />PMIO <br />PM2.5: <br />Well Redevelopment <br />4 <br />41 <br />18 <br />1 <br />1 <br />Significance. Threshold <br />55 <br />55 <br />550 <br />150 <br />55 <br />Significant Impact? <br />No <br />No <br />No <br />No <br />No <br />Proposed Project Operation- Generated Local Air Pollutants <br />Operational emissions would be generated by the Proposed Project from <br />maintenance activities conducted at the injection well sites. As shown in Table <br />103 Project operational emissions of NOx, CO, PM,Q and PM2,5 would be less <br />than the SCAQMD's locallized significance thresholds. <br />Table 103: Proposed Project Local Operational Emissions <br />Phase <br />NQX Co <br />PM1t1 <br />PM2 5 <br />Well Redevelopment <br />40 17 <br />1 <br />1 <br />Significance Threshold <br />83 753 <br />12 <br />4 <br />Significant Impact? <br />No No <br />No <br />No <br />Mid Basin Centennial Park �ger*6Project Final EIR 8 -15 <br />