Laserfiche WebLink
0=171fftl <br />Phase 8- Well Equip/Paving <br />0,02 <br />0.06 <br />CO <br />0.02 <br />-0.006 <br />Total <br />024 <br />2.76 <br />—0.07-- <br />2.31 <br />0.18 <br />0.12 <br />General Confornilty de <br />10 <br />10 <br />100 <br />100 <br />100 <br />mirfirnis lirnits/NEPA <br />No - <br />No - <br />Na <br />Na <br />Na <br />thresholds in toms per year <br />Significant Impact? No I No I No No No <br />Sao Appendix D tar GaIEE Mod Mad0OUtpUtS J <br />Regional Operational Emissions General Conformity Analysis <br />The total annual criteria pollutant emissions for the Proposed Project are shown <br />in Table 105 and are compared with the General Conformity de minimis annual <br />thresholds. As shown in Table 105, annual emissions of all pollutants would be <br />less than the applicable General Conformity thresholds. <br />Table 105: Proposed Project Estimated Annual Operation Emissions <br />Phase <br />Voc <br />Ox <br />CO <br />PMI D <br />PM2.5 <br />Well Redevelopment <br />0.04 <br />CAC <br />0.18 <br />0,01 <br />0.01 <br />General Conformity de <br />minimis limiN/NEPA <br />thresholds in tons per year <br />10 <br />10 <br />100 <br />100 <br />100 <br />Significant Impact? <br />No - <br />No - <br />Na <br />Na <br />Na <br />General Conformity <br />As shown in Table 106 the annual emissions the Proposed Project would <br />generate would be less than the de minimis threshold for General Conformity. <br />Therefore, additional analysis would not be required- <br />I <br />Mid Basin Centennial Park Ace-rlftli Project Final EIR 8-17 <br />