Laserfiche WebLink
Section 3 <br />hisiher recommendation within 48 hours of being <br />granted access to the site, If feasible, the <br />recommendation of the MLD shall be followed <br />and may include scientific removal and non- <br />destructive analysis of the human remains and <br />any items associated with Native American <br />burials (California Health and Safety Cade <br />§7050.5). If the landowner rejects the <br />recommendations of the MILD, the landowner <br />shall rebury the remains with appropriate dignity <br />en the property in a location that will not be <br />subject to further subsurface disturbance <br />(California Public Resources Code §5097.98). <br />CR -3: A qualified Paleontologist be notified and <br />OCWD <br />During <br />retained when earth- moving activities are <br />Construction <br />anticipated to impact undisturbed deposits in the <br />Older Quaternary Alluvium on the project site. <br />The designated Paleontologist should be present <br />during the pre -grade meeting to discuss <br />paleontological sensitivity and to assess whether <br />scientifically important fossils have the potential to <br />be encountered The extent of monitoring <br />activities will be determined at the meeting in <br />consultation with the OCWD. If any scientifically <br />important large fossil remains are uncovered <br />during earth- moving activities, the Paleontological <br />Monitor will divert heavy equipment away from <br />the fosslt site until s /he has had an opportunity to <br />examine the remains. Samples of Older <br />Quaternary Alluvium should be collected for <br />processing and examination for very small <br />vertebrate fossils. <br />Geology /Soils <br />GEO -1: Prior to the start of construction OCWD <br />OCWD <br />Prior to <br />will obtain coverage under the General <br />Construction <br />Construction Permit by the State Water <br />Resources Control Board and in compliance with <br />the permit shall file a Notice of intent with the <br />State Water Resources Control Board and <br />prepare and implement Storm Water Pollution <br />Prevention Plan. <br />GEO -2; The final design and construction of the <br />OCWD <br />During Final <br />project will incorporate the geotechnical <br />Design and <br />recommendations provided in the Leighton <br />Construction <br />Consulting Geotechnical Report prepared for the <br />Mid Basin Centennial Park Injection Well Project. <br />OCWD Mid Basin Centennial Park Injection Well Project Draft EIR <br />Response to Comments /Mitigation Monitoring Program 4 -5 <br />25C -403 <br />