My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT - OCWD CENTENNIAL PARK
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2016
>
06/21/2016
>
25C - AGMT - OCWD CENTENNIAL PARK
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2016 9:59:52 AM
Creation date
6/16/2016 3:53:42 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25C
Date
6/21/2016
Destruction Year
2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 <br />Hyd rologylWater Quality: <br />i Prior to construction operations OCWD <br />OCWD <br />Prior to <br />will obtain an encroachment permit from the <br />Construction <br />County of Orange that allows for the discharging <br />of groundwater from the Mid Basin Centennial <br />Park Injection Well Into the Greenville Banning <br />Flood Control Channel. <br />HWQ-Y: The final design of the Mid Basin <br />OCWD <br />Prior to final <br />Centennial Park Injection Wells Project will <br />design and <br />incorporate the storm water management <br />during <br />program contained in the approved Mid Basin <br />construction. <br />Centennial Park Injection Well Non - Priority <br />Project Water Quality Plan. <br />HWQ-8: Prior to conducting dewatering activities <br />OCWD <br />Prior to <br />OCVVD will receive NPDES dewatering permit <br />Construction <br />from the Regional Water Quality Control Board. <br />HWQ-A, Prior to construction activities occurring <br />OCWD <br />Prior to <br />along the west and east levees of the Santa Ana <br />Construction <br />River OCWD will obtain an encroachment permit <br />from the County of Orange and 408 permit from <br />the U.S. Army Corps of Engineers. <br />HWQ-5: Prior to placement of the water supply <br />OCWD <br />Prior to <br />pipeline along the nose piers of the Edinger <br />Construction <br />Avenue Bridge OCWD will obtain an <br />encroachment permit from the County of Orange <br />and as part of the permit conditions will <br />coordinate with the County of Orange Flood <br />Operations staff on the design of the water supply <br />pipeline to ensure it does not impede flood <br />maintenance activities along the bridge during <br />flood events. <br />Noise <br />i The project will incorporate the noise <br />OCWD <br />Prior to <br />reduction design features identified in the Mid <br />Construction <br />Basin Centennial Park Injection Well Project <br />EIR1F_A. <br />OCWD Mid Basin Centennial Park Injection Well Project Draft BIR <br />Response to Comments /Mitigation Monitoring Program 4-6 <br />25C -404 <br />
The URL can be used to link to this page
Your browser does not support the video tag.