Laserfiche WebLink
Section 8 <br />TrafflclTransportation <br />T -1: Prior to start of pipeline construction <br />OCWD <br />Prior to <br />activities along Edinger Avenue a Traffic <br />Construction <br />Management Plan will be prepared and approved <br />by the City of Santa Ana, The Traffic <br />Management Pier will include traffic control <br />devices and signage to avoid vehicle and <br />pedestrian conflicts from the temporary closing of <br />Edinger Avenue. <br />T -2: Pipeline construction along the Centennial <br />OCWD <br />During <br />Loop will be conducted during the right time <br />Construction <br />hours. Steel plates will be placed over exposed <br />trenches at the end of work activities to allow <br />vehicle access during the day, <br />T -3: A Traffic Control Plan with traffic control <br />OCWD <br />During <br />devices and signage will be implemented at <br />Construction <br />Parking Area 2 directing student drop -offs to the <br />turn - around located north of Centennial Park <br />Skate Park <br />T -4: A Construction Safety Plan will be prepared <br />OCWD <br />During <br />and implemented that will include fencing around <br />construction <br />work areas to prevent public access and the use <br />of flag man if needed to direct students and <br />pedestrians away from construction equipment <br />and activities. <br />T -5: During construction activities a signage <br />OCWD <br />During <br />program will be implemented that will identify <br />Construction <br />parking areas where available. <br />OCWD Mid Basin Centennial Park Injection Well Project Draft EIR <br />Response to Comments /Mitigation Monitoring Program 4 -7 <br />25C -405 <br />