My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASPLUNDH CONSTRUCTION CORP.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ASPLUNDH CONSTRUCTION CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 2:10:03 PM
Creation date
7/28/2016 3:08:13 PM
Metadata
Fields
Template:
Contracts
Company Name
ASPLUNDH CONSTRUCTION CORP.
Contract #
15-6828
Agency
Public Works
Council Approval Date
4/19/2016
Expiration Date
12/22/2017
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15-6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />4 <br />Furnish and Install UPS Cabinet and UPS <br />1 <br />EA <br />00 <br />SS%)�i�.' <br />$ �b osn <br />Amount <br />assembly <br />Remove and salvage existing traffic signal <br />1 <br />EA <br />$,500.124, 7 <br />5 <br />Relocate existing traffic signal controller <br />1 <br />EA <br />N <br />$ <br />co <br />,g-oo <br />assembly to new controller cabinet <br />Furnish and Install Type P cabinet on <br />1 <br />EA <br />6 <br />Rewhe Intersection <br />1 <br />LS <br />e0 <br />a 00 <br />7 <br />Remove existing pull box <br />1 <br />EA <br />$ ,Q(J,�^ <br />$ i0a, 00_ <br />8 <br />Furnish and Install No. 6E Pull Box <br />2 <br />EA <br />a <br />9 <br />Furnish and Install new 2" conduit <br />20 <br />LF <br />,y �° <br />$ <br />10 <br />Furnish and install new 3" conduit <br />220 <br />LF <br />$ �� . <br />y 9 /vl7"6 0� <br />11 <br />Furnish and install new 4" conduit <br />40 <br />LF <br />$ <br />$ 'J 12t`O " <br />'aAr <br />12 <br />germinate fiber drop cable in fiber patch <br />1 <br />EA <br />$;r17� <br />$ �,^,Wr, <br />anel <br />/ 0[/ <br />13 <br />Furnish and Install 410 Tracw Wire <br />260 <br />LF <br />$ , <br />$ <br />14 <br />Re-pull' distribution cable from controller <br />1 <br />EA <br />$ % <br />$ 0' <br />cabinet to 46E Pull -Box <br />✓ �6 <br />J , <br />TOTAL ALTERNATE BID#3 <br />$° <br />Alternate Bid #4— Wilson Street at Harbor Blvd Cabinet Upgrades — City of Costa Mesa <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Remove and salvage existing traffic signal <br />1 <br />EA <br />$,500.124, 7 <br />$ • � <br />cabinet. <br />1 <br />,g-oo <br />2 <br />Furnish and Install Type P cabinet on <br />1 <br />EA <br />existing foundation <br />3 <br />Relocate existing traffic signal controller <br />1 <br />EA <br />$ 506-1$ <br />UO <br />Spa <br />�� <br />assembl to new controller cabinet <br />I <br />1 <br />TOTAL ALTERNATE BID#4 <br />^ <br />$ <br />Alternate Bid #5 — Hamilton Street at Harbor Blvd Cabinet Upgrades — City of Costa Mesa <br />Item <br />Description <br />City <br />Unit <br />Unit Price <br />Amount <br />1 <br />Remove and salvage existing traffic signal <br />1 <br />EA <br />$ ii & jy d�00 <br />vVV <br />U"0 <br />�' <br />cabinet. Remove foundation complete. <br />1 <br />O�D• <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.