My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASPLUNDH CONSTRUCTION CORP.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
Completed Projects
>
ASPLUNDH CONSTRUCTION CORP.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2025 2:10:03 PM
Creation date
7/28/2016 3:08:13 PM
Metadata
Fields
Template:
Contracts
Company Name
ASPLUNDH CONSTRUCTION CORP.
Contract #
15-6828
Agency
Public Works
Council Approval Date
4/19/2016
Expiration Date
12/22/2017
Destruction Year
2021
Notes
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO. 15-6828 <br />Harbor Boulevard Corridor Traffic Signal Improvements <br />(as part of Harbor Blvd Traffic Signal Synchronization Project) <br />z <br />Furnish and Install Type P cabinet an new <br />1 <br />EA <br />s3) <br />foundation. <br />'�®®° <br />3 <br />Furnish and Install OPS cabinet and UPS <br />g <br />EA <br />J do® ��" <br />Db O <br />Assembly <br />I <br />I <br />4 <br />Relocate existing traffic signal controller <br />1 <br />EA <br />oo <br />$ 1 �®®, ") <br />u� <br />�® ` <br />assembly to new controller cabinet <br />t'S <br />TOTAL ALTERNATE SIM <br />$00 00 <br />TOTAL Base Bid plus Alternate 1,2,3,4 & 5 $ J. q0; <br />The lowest responsible bidder shall be selected based on the Tatal Base Bid. The City reserves <br />the right to award the Base Bid only, Base Bid plus any Alternate Bid Items (if any) or Base Bid <br />plus all Alternate Bid items. <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves <br />the right to Increase or decrease the quantity of this Item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total contract base bid <br />amount shown above, within eighty (80) working days after the commencement date stated in <br />the Notice to Proceed. <br />If Alternate Bid#1 is awarded, five (S) working days will be added to the working days assigned <br />to complete the contract base bid items. <br />If Alternate Bid#2 is awarded, five (5) working days will be added to the working days assigned <br />to complete the contract base bid items. <br />If Alternate Bid#3 is awarded, twenty (20) working days will be added to the working days <br />assigned to complete the contract base bid items. <br />If Alternate Bid#4 is awarded, ten (10) working days will be added to the working days assigned <br />to complete the contract base bid items. <br />am <br />
The URL can be used to link to this page
Your browser does not support the video tag.