My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIMPLEX GRINNELL LP - 2016
Clerk
>
Contracts / Agreements
>
S
>
SIMPLEX GRINNELL LP - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2016 11:19:01 AM
Creation date
10/17/2016 11:13:56 AM
Metadata
Fields
Template:
Contracts
Company Name
SIMPLEX GRINNELL LP
Contract #
A-2016-198
Agency
POLICE
Council Approval Date
8/2/2016
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Intrusion Test & Inspect - Parts and Labor (Panel & Peripherals) - INTRUSION SYSTEM <br />PANEL AND PERIPHERAL COMPONENT REPLACEMENT FOR LISTED INTEGRATED SECURITY SYSTEMS: <br />The Platinum Plan covers component replacement on the central processing unit, including reprogramming of <br />system due to failure, replacement of circuit boards, and components in the control panels, annunciator panels, <br />transponders, printers, keyboards monitors, and peripheral devices (Motion sensors, access control readers, closed <br />circuit television cameras, monitors, audible/ visible units, door contacts.) associated with system. Replacement of <br />faulty wiring, batteries, and /or ground faults are not covered. <br />TEST AND INSPECTION OVERVIEW: <br />Our trained technicians will perform inspections and diagnostic tests for the accessible peripheral devices listed and <br />currently connected to the facility life safety system. Tests will be scheduled in advance. (See "List of Equipment' <br />page for equipment to be tested.) <br />DOCUMENTATION: <br />Accessible components and devices shall be logged for: <br />Location of each device tested, including system address or zone location <br />- Test results and applicable voltage readings <br />- Any discrepancies found noted (individually and on a separate summary page) <br />Inspection documentation provided to Customer. NOTE: Certain additional services may be required by the <br />Authority Having Jurisdiction (AHJ). AHJ or internal organizational requirements may be more restrictive than <br />state /provincial requirements. Building owners and managers should make themselves aware of applicable codes <br />and references in order to ensure that contracted Services fulfill requirements. <br />Emergency Service (Normal Working Hours) <br />Emergency Service (Provided during normal working hours, Monday- Friday excluding our holidays). This service <br />includes labor, travel, and mileage charges for repairs associated with normal wear and tear. Standard service will <br />be provided within 24 hours of notification Monday through Friday, excluding our holidays, unless outlined in the <br />agreement, <br />SERVICE COVERAGE: <br />Silver Service Plan - Labor charged at standard service rates up to and including overtime <br />Gold Parts Service Plan - Panel Parts included. Labor charged at standard service rates up to and including <br />overtime <br />Gold Labor Service Plan - Panel Labor included. Parts not included <br />Gold Parts /Labor Service Plan - Parts and Labor included on Panel only <br />Platinum Service Plan - Parts and Labor Included on covered system <br />SG0001 US.ENG (Rev. 1212010) Page 2 or 8 © 2010 SimplexGrinnell LP. All rights reserved <br />
The URL can be used to link to this page
Your browser does not support the video tag.