Laserfiche WebLink
D E S I G N 4�Cssi YEC Yu Rk I.114CSCn FE IA., 1"TKr..t . Exs;isi+' UE's <br />FES PROPOSAL <br />Revised Feb 24, 2017 CLR will carry -out the work described in our January 6, 2017 response to RFP NO: 16-131 <br />fora Lump Sum Professional Fee of One Hundred Sixty -One Thousand Three Hundred <br />Dollars ($161,300) as detailed in the Fee Breakdown chart below. <br />Reimbursable expenses are in addition to the Professional Fee and represent the cost of <br />travel (air/ground), long distance communication, reproduction (plotting, printing, digital <br />imaging), retailing, etc. and are estimated (not an upset limit) to be Seventeen Thousand <br />Three Hundred Fifty Dollars ($17,350). <br />FEE BREAKDOWN <br />Firm Prufesuonal FE". 4u OfFee <br />CLR Design 5108,750 67.5'15 <br />Master Pranning. Archirecrate. <br />Landscape Architecrure <br />Exhibit CDesryft <br />Zoo Advisors $40,050 25wo <br />strateg'c fivsinv5l Ptarwing <br />KPFF 512,500 7.545 <br />Utility 8nfrasrruclure Planning <br />Total Fees $161,304 100010 <br />CLR & Sub -consultant Expenses 57,450 <br />Zoo Advisors Expenses 59,900 <br />Total Fees A Expenses $178,650 <br />QUALIFICATIONS <br />Workplan Scope Modifications & Clarifications: CLR is currently working with the Santa <br />Ana Zoo on the Giant River Otter Project, providing Full Design Services. As part of that <br />effort under contract, we will provide site inventory & analysis of the existing Amazon's <br />Edge exhibit area, as well as services for developing new concepts for this 1-1.5 acre <br />zone within the heart of the campus. As part of this revised fee and scope proposal for <br />the Facilities Master Plan, we have made a slight reduction to work hours associated <br />with Tasks I - IV, as CLR will be providing analysis and design} services under the Otter <br />Contract. further, running both projects concurrently will allow for better coordination <br />of work products, and from a facilities and strategic planning standpoint, allow for <br />seamless integration of concepts at both the project and overall campus level. <br />2 tin -Site Workshop Attendance,, <br />CLR: (5) 2 -day workshops, 2 staff in attendance (See Proposed Schedule), <br />ZA: (41 workshops/presentations including €21 2 -person trips and (21 1 -person trips <br />KPFF: Asstrrning attendance at (3) half-day workshopslsite visits <br />" As part of this revised fee and scope proposa', we are proposing to piggyback Otter <br />and Master Plan workshops as much as feasible. to allow for a slight reduction in design <br />c 21, ;64 075n s 2 1 i i-ia 115 _ 331 chaatnw ,,re -_t :u:ce 1000 • P1,0aldelphw Pa 0107 <br />32951aguna c --y— road, suria t • I sguna Uea rh ;a 92051 <br />