My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 GLOBAL, INC. - 2017
Clerk
>
Contracts / Agreements
>
N
>
NV5 GLOBAL, INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 4:30:00 PM
Creation date
5/30/2017 4:31:00 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5 GLOBAL, INC.
Contract #
A-2017-086
Agency
Public Works
Council Approval Date
4/18/2017
Expiration Date
4/7/2019
Insurance Exp Date
5/1/2019
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />A.pp elldix, <br />ATTA.CILbiENT I <br />SCOpE Or, WoRx <br />CITY OF SANTA ANA <br />REQUEST FOR. PROPOSALS <br />FOR <br />CONSTRUCTION ElNG)NEE ING SERVICES <br />FOR <br />SANTA ANA-DELHI <br />HSI CHANNEL D I SIGN <br />RFP 1.� O.: 16-080 <br />A. DESCIUTION <br />The City desires to engage a professional consultant to perform construction engineering service for the Santa. <br />Ma -Delhi Channel Diversion projoct. The Coxasultant shall provide an individual to act as Resident Engineer <br />or constractian inspector and serve as w extension of City stn f to assist the City in imaging construction, <br />ensure that tho work to be conipleted in a.ocordance with the contract' documents and respond directly to tf.e <br />City of Santa Ana Constriction Manager or his authorized representative, City staff will manage the <br />construction of the project and oversee the work of the Resident Engineer/inspector, <br />D, SCOPE OF SERVICES <br />Thu required sorvlcos shall include, but not be limited to, the following: <br />1, The Residt at may he a registered engineor in the State of Califbi-ria and <br />shall represent the City Construction Engin= in the field. <br />2, Attend pre -construction ineeting. May schcdule and conduct weekly construction and progress <br />mood ngs to discuss such. matters as proceciutos, piogre9,s, problems and sched-aling, May prepare <br />mid promptly distribute aninutes. <br />3, May review construction schedule, including activity segvcnccs and duration, schedule of <br />submittals and. sohedule of delivery for products with long; lead-time. Update the project <br />schedule as required to show current conditions and revisions roquized by actual progress. <br />4, May conduet corlaprcllensive evaluation of change order requoats, provide independent <br />Gsti�xrates, renderreoomrn�adatiaras anal assist i� clxinr resolution. <br />51 Monitor the contractor's safety pro gtain, Take npoessary steps to ensure alae job site conditions <br />are in acrniptiatroe with OSHA rogclations. <br />6, Maintain,cost accortinting records on authotizod Nvork performed wider ualt costs and additional <br />work pet:fonnod oo the ba si.s of actual coats of labor and inatorials, off• other work requiring <br />accou ting xecor'q. <br />ss�ffi mrn�x��..�,�...�f_�e,�ygt�y'jrt xn�u�rc1�� ^u _ _ „�:r �v�nbmwtier<�nc�anuRcwrr� <br />msmewiva� <br />City of Santa Ana RrP 16-080 <br />Page A'i_q <br />
The URL can be used to link to this page
Your browser does not support the video tag.