My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
NV5 GLOBAL, INC. - 2017
Clerk
>
Contracts / Agreements
>
N
>
NV5 GLOBAL, INC. - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2018 4:30:00 PM
Creation date
5/30/2017 4:31:00 PM
Metadata
Fields
Template:
Contracts
Company Name
NV5 GLOBAL, INC.
Contract #
A-2017-086
Agency
Public Works
Council Approval Date
4/18/2017
Expiration Date
4/7/2019
Insurance Exp Date
5/1/2019
Destruction Year
0
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. May develop anal implement procechares for tho review and processing of applications by <br />contractor fox progress and final payments. Ma1za recatnmen.dations fox certification to the City <br />for payment, <br />8. Determine that the work of contractor is being pedonuod iiz accordance with the caa.tract <br />doctiments. Male mcova mendations to the City regarding special inspection or testing of work <br />not in complianoo with the provisions of the contract documents. Subject to roview by the City, <br />reject work which does not conform to the requirements ofoontract dooumerits, <br />9. Tlia individual (Resident Enginoer/inspectox) shall not be responsible for constnlction means, <br />mathods, techui.ques, sequences and procedures employed by the contractor in the performance <br />of the contract, and shall not be responsible for the failure of the contractor to carry out work in <br />accordance with the contract documents, However, any errors, omissions, or discrepa.nuics <br />found in the Contract Documents shall be called to the attention of the Constiuctioll Ma -pager <br />and clarified prior to construction starts, <br />10. Consult with the City whea the contractor requests interpretations of the meaning acid intetat of <br />the dzawiap and specifications, and assist is achieving the resolution, of problems which, may <br />arise, <br />11. Record the progress of the project, Suba-At written daily and progress roports to the City. KQops <br />a daily log containing a record of weather, contractor's work on the site, number of workers, <br />work accomplished, problems encountered, and other rolevaiit data. Make the log available to <br />the Ci Prepare and send Weekly Statement of Working .Days to the contractor. Monitor <br />contra z's compliance with labor code requirements, <br />12. Maintain (at the job site) records of contract documents including drawings, addenda, Change <br />orders, and. othor modifications of plans and specifications imwked to show all changes made <br />durins constaiction. Maintain a5 -built =ords of izndergrowid utilities, including locations and <br />depths of trenches..A.t the completion of the project, deliver to the City all contract documents <br />including as -built records, <br />13, Evaluate th(a completion of tlne work of; the contractor and make recommendations to the City <br />when work is ready for final impoction. Assist the Cityin condm ing fiaFd impeutiozls; <br />14. Facilitate and coordinate inspection by representatives of other agencies. <br />15, Schokle acid coordinate Special inspection, and nia.todal testing with the County of Orange or <br />Qthcr consultaI16. <br />�mncMeamiws l'em�'awcr.r��atuar.q•�am .Syme;{�;6 �onenu+++cvsiaa.g?�»��r4�uu��rmvRs,�yi�gw?�u�az�uuaxm�,Tmnn t�w�h9uawa�erprg <br />City of Santa Ala RPP 16-080 <br />Page AI -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.