Laserfiche WebLink
Grand Avenue Widening Project Environmental Impact Report Section 1.0 <br />part of Alternative 1. The Mitigation Monitoring Program (MMP) described in detail later in <br />Section 8.0 (Mitigation Monitoring Program) is incorporated in the description of Alternative 1. <br />1.1.3 DESCRIPTION OF BUILD ALTERNATIVE 2 <br />Alternative 2 assumes the project segment of Grand Avenue would be widened from the existing <br />four lanes in a cross section that varies from 80 to 110 feet wide, to six lanes in a 120 foot wide <br />cross section, with a landscaped median. The addition of the landscaped, center median would <br />remove the opportunity for some left turns across this segment of Grand Avenue. Existing <br />driveway accesses would be retained. Under this Alternative, the widening, including the <br />acquisition of right-of-way, would occur intermittently on both the east and west sides of Grand <br />Avenue. Alternative 2 is anticipated to result in the acquisition of a total of 654,318 square feet of <br />right-of-way, in a total of 20 partial takes and 56 full takes of existing parcels along this segment of <br />Grand Avenue. The existing edge of right-of-way for Grand Avenue, and the proposed edge of <br />right-of-way under Alternative 2, are shown on Figure 1-3. Table 3-1, provided later in this EIR, <br />identifies the full and partial takes under Alternative 2, for each of the affected parcels along this <br />segment of Grand Avenue. <br />The resulting cross section would be consistent with the Major Arterial designation for this segment <br />of Grand Avenue in the City of Santa Ana General Plan Circulation Element. This cross section <br />would include a five-foot wide, on -street, Class II Bikeway as shown on Grand Avenue as shown in <br />the adopted City of Santa Ana Bikeway Master Plan. This Alternative would also include a <br />landscaped median. The estimated cost for this Alternative, including final design, right-of-way <br />acquisition, demolition and construction, is $39.89 million. <br />As discussed above, Alternative 2 will require the acquisition of property to accommodate the <br />widened road. Because not all the property acquired will be used for the construction of Alternative <br />2, there will be remainder or remnant parcels left after the completion of construction. The City <br />anticipates the majority of these remainder parcels would be combined into larger, developable <br />parcels and sold to private parties for development. However, it is possible that some remainder <br />parcels, even when combined with other remainder parcels, may not meet the City's minimum <br />lot size requirements. In that event, the City would probably sell those remainder parcels to <br />adjacent property owners. <br />These parcels along the Grand Avenue corridor are designated for commercial or residential uses in <br />the City's General Plan Land Use Element. The commercial designation applies to all the parcels on <br />the west side of Grand Avenue for the entire project length from Seventeenth Street to First Street. <br />The width of the commercial designation varies on both the east and west sides of Grand Avenue <br />and is adjacent to areas designated low density residential. The commercial designation applies to <br />the east side of Grand Avenue for the entire project length except for a small segment between 10 <br />and 15th Streets that is designated low density residential. <br />The EIR for the General Plan Land Use Element addressed potential impacts of commercial and <br />residential uses on this segment of Grand Avenue at a program or planning level. As part of the <br />future development process for these remainder parcels, any proposed commercial or residential <br />uses would be subject to independent environmental review. That independent review will assess <br />F: IPROJ-ENMGrand eirWew Text - GrandlSection 1.0-new.doc Page 1-12 <br />