My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS - 2002
Clerk
>
Contracts / Agreements
>
P
>
P & D CONSULTANTS - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:32:30 AM
Creation date
8/10/2017 11:34:03 AM
Metadata
Fields
Template:
Contracts
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Widening Project Environmental Impact Report Section 1.0 <br />whether the potential impacts of proposed uses were addressed in the Land Use Element EIR or will <br />require additional, separate environmental review prior to approval of the proposed uses by the City. <br />It is anticipated that the widening of Grand Avenue under Alternative 2 will be constructed in <br />phases, based on available funding. For example, as funding becomes available, the intersections <br />could be improved, followed later by the widening of Grand Avenue on the segments between the <br />intersections. Therefore, the construction period for the widening under Alternative 2 would not <br />occur in one continuous time period. Construction activities could occur intennittently over a <br />period of severalyears before construction of the entire widening project is complete. <br />Alternative 2 also includes the mitigation measures identified in this EIR. Mitigation measure N-2, <br />described later in Section 3.6 (Noise) indicates that Alternative 2 will require noise barriers adjacent <br />to several properties on the project segment of Grand Avenue, to reduce project related noise to <br />below the City of Santa Ana noise standards. The noise barriers at these properties are included as <br />part of Alternative 2. The MMP described in detail later in Section 8.0 is incorporated in the <br />description of Alternative 2. <br />The City has identified Alternative 2 as the preferred alternative for the proposed widening of Grand <br />Avenue. Alternative 2 meets all five of the defined project objectives and the majority of the <br />significant adverse environmental impacts under this Alternative can be mitigated to below a level <br />of significance. <br />1.1.4 PROPERTY ACQUISITION <br />Both Alternatives 1 and 2 will involve acquisition of privately owned property to provide adequate <br />right of way for the road widening and setbacks from the new curb of Grand Avenue consistent with <br />City requirements. This process will involve precise surveys of the area to be acquired, property <br />appraisals, negotiation with each of the property owner(s) on compensation, and finally City <br />Council approval of the acquisition agreements. There may be instances where only a part of the <br />property would be necessary to accommodate the road widening. In these instances it is possible <br />that an existing building could be physically retrofitted to accommodate the setback from the new <br />property line. The issue of full or partial acquisition will be negotiated with each property owner <br />pursuant to the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 <br />as implemented by the City of Santa Ana. Much of this process is described in a question and <br />answer format in the City of Santa Ana Handbook on Acquisition which is included as Appendix I <br />in this EIR. This issue of properties that will be affected under both alternatives is further discussed <br />in Section 3.2 (Land Use). <br />1.1.5 ALTERNATIVES <br />Section 15126(d) of the CEQA Guidelines requires EIRs to consider a reasonable range of <br />alternatives to the project or the location of a project which would feasibly attain most of the project <br />objectives but which would avoid or substantially lessen any of the significant adverse impacts of <br />the project. This Section of the CEQA Guidelines specifically requires that a No Project Alternative <br />be assessed in the EIR. <br />F: IPROJ-ENMGrand eirWew Text - GranMection 1.0-new.doc Page 1-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.