My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS - 2002
Clerk
>
Contracts / Agreements
>
P
>
P & D CONSULTANTS - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:32:30 AM
Creation date
8/10/2017 11:34:03 AM
Metadata
Fields
Template:
Contracts
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Widening Project Environmental Impact Report Section 1.0 <br />TABLE 1-2 <br />SUMMARY OF COMMENTS IN REPSONSE TO <br />THE NOTICE OF PREPARATION <br />Agency <br />Comment <br />IS/EIR Sections Where Comment is <br />Addressed <br />City of Tustin Public <br />No Comment <br />Works/Engineering <br />City of Garden Grove Planning <br />No impact on the City of Garden Grove. <br />Department <br />The Gas Company, Orange Coast <br />• Comments on the presence of gas facilities <br />• Initial Study pages 3-30 to 3-32. <br />Region <br />in the project area and gas service to the <br />project. <br />Planning and Development Services <br />No comment. <br />_ <br />Department County of Orange <br />Southern California Association of <br />• Consistency with growth policies. <br />• EIR Section 3.2 (Land Use and <br />Governments <br />• Consistency with Regional Mobility <br />Planning) <br />Element policies. <br />• BIR Section 3.4 (Air Quality) <br />• EIR Section 3.5 (Transportation and <br />Circulation <br />South Coast Air Quality <br />• Identify air quality impacts and provide <br />• EIR Section 3.4 (Air Quality) <br />Management District <br />mitigation measures. <br />Orange County Transportation <br />No comment. <br />_ <br />Authority <br />California Department of <br />No comment. <br />Transportation <br />Santa Ana Unified School District <br />• Coordinate student pedestrian routes with <br />• Initial Study pages 3-28 to 3-30. <br />Remington Elementary and Siena <br />Intermediate schools prior to and during <br />construction. <br />County Sanitation Districts of <br />• Protect existing sewer line in place; <br />• Initial Study pages 3-30 to 3-35. <br />Orange County, California <br />coordinate changes in manhole cover <br />elevations and any proposed relocation of <br />sewer with the Districts. <br />The format of the scoping meeting was an informal open house. Maps of the project alternatives, <br />showing the expected property acquisition needs, and aerial photographs of the project area were <br />available for review. City staff and consultants to the City were available to explain the project <br />alternatives and answer questions. Because of the number of attendees, it was helpful to provide a <br />general overview of the proposed project, followed by general questions and answers. <br />Several attendees provided written comments at the scoping meeting. In addition, verbal comments <br />provided at the meeting were noted by staff and the consultants. Table 1-3 summarizes the written <br />and verbal comments provided by the meeting attendees and indicates where in the IS and/or the <br />EIR each specific environmental topic raised in these comments letters is located. <br />1.3.4 FORMAT OF THE EIR <br />As noted above, this EIR focuses on the analysis of those environmental parameters which may <br />experience significant adverse impacts as a result of the proposed • Grand Avenue widening <br />alternatives. This analysis is documented in this Focused EIR as follows: <br />F.IPROJ-ENVIGrand eirlNew Text- GrandlSection 1.0-new.doc page I-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.