My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
P & D CONSULTANTS - 2002
Clerk
>
Contracts / Agreements
>
P
>
P & D CONSULTANTS - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 9:32:30 AM
Creation date
8/10/2017 11:34:03 AM
Metadata
Fields
Template:
Contracts
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Grand Avenue Widening Project Environmental Impact Report Section 2 0 <br />2.7 TRANSPORTATION IMPACTS FOUND NOT TO BE SIGNIFICANT <br />The proposed project will result in an increased number of vehicles on the project segment of Grand <br />Avenue and in improved traffic flows on this segment of Grand Avenue. Therefore, the proposed <br />project is anticipated .to result in a less than significant impact related to traffic congestion. No <br />mitigation is required. <br />The widening of the project segment of Grand Avenue will be consistent with the City's standards <br />for Major Arterials and is considered to be compatible with the adjacent land uses. Therefore, the <br />proposed project will not result in hazards related to these land uses. No mitigation is required. <br />The widening of the project segment of Grand Avenue will result in short term lane and driveway <br />closures, detours and/or traffic delays. The project construction activities will be coordinated with <br />the City of Santa Ana Public Works Agency (PWA). This coordination will include working with <br />adjacent land uses to maintain emergency access through the project segment and to adjacent <br />land uses including the use of temporary driveways as feasible, signing and other features to <br />protect vehicular and pedestrian traffic through the area during construction. As a result of this <br />coordination by the PWA, the widening alternatives will not result in significant adverse impacts <br />during construction related to design hazards and emergency access. No mitigation is required. <br />Alternative 2 includes a five-foot, on street, bicycle lane, which is consistent with the standard of the <br />City of Santa Ana Bikeway Master Plan and the Orange County Commuter Bikeways Strategic <br />Plan (CBSP). Alternative 1 does not include a bike lane on Grand Avenue and, therefore, is not <br />consistent with the City's Bikeway Master Plan or the CBSP of the Orange County Transportation <br />Authority (OCTA). However, as described earlier, since the circulation of the NOP/IS, <br />Alternative 1 has been further refined to include the deletion of the bike lane on this segment of <br />Grand Avenue from the City of Santa Ana Bikeway Master Plan and the OCTA's CBSP as part <br />of the project description for this Alternative. The potential adverse impacts of the deletion of <br />this segment of bike lane from these Master Plans are assessed in Section 3.2 (Land Use and <br />Planning). Because the deletion of the bike lane on this segment of Grand Avenue from these <br />Master Plans is included as part of the description of Alternative 1, refined mitigation measure <br />LP -1, as described in Section 3.2.5, is necessary to maintain General Plan consistency. <br />Alternative 2 will result in some benefit related to bicycle safety and accommodation on the project <br />segment of Grand Avenue. No mitigation is required. <br />There are currently no bus turnouts on the project segment of Grand Avenue. Alternatives 1 and 2 <br />include bus pads and bus turnouts consistent with the Americans with Disabilities Act guidelines. <br />Immediately prior to construction, temporary bus stops will be provided, as needed, and bus detours <br />will be determined, where appropriate. Therefore, the proposed widening project will not conflict <br />with adopted policies supporting alternative transportation. No mitigation is required. <br />There are no navigable watercourses or rail lines crossed by or, near the project segment of Grand <br />Avenue. There are no airports near the project segment of Grand Avenue. Therefore, the proposed <br />project will not result in impacts on rail, waterborne or air traffic services or facilities. No <br />mitigation is required. <br />1": IPROJ-ENPIGrand eirWew Text- GrandlSection 2.0-new.doc Page 2-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.