Laserfiche WebLink
D, Horizontal control shall be based on the 1983 Notch American Datum (NAD83), tied to <br />a minimum of two proximate County of Orange, CCS83, Zone Vl, 1991,35 Epoch <br />Adjustment control points. Project coordinate values shall be provided in U.S. Survey <br />Peet. The County control points shall determine the Basis of Bearing for the project. <br />E. Vertical control shall be based on the North American Vertical ,Datum of 1988 <br />(NAVD88), tied to a minimum of two proximate County of Orange bench marks. <br />Project elevations shall be provided in U.S. Survey Meet. <br />R Horizontal alignment(s) for the project shall be tied to the survey centerline monuments <br />within the project area. <br />G. With the coordinate values, a full location and detailed description, including point <br />character with reference(s), shall be provided for all found and set monuments for the <br />project. For this purpose, a sketch of the control network is required. <br />FL Copies of all survey field notes and raw data files shall be provided along with a listing <br />of the final coordinates for all surveyed points. The digital file format for the listing <br />shall be: point number, northing, easting, elevation, description (comma delineated with <br />no spaces, one point per line). The coordinate precision shall be one hundredth of a foot. <br />1. At any given time the City may need to mobilize survey crews to different project sites, <br />the consultant shall have a minimum of three (3) survey crews for mobilization. <br />J. All City CADD standards as well as Microstation configuration files are located at: <br />K. http://www.santa-ana.org/pwa/EngiiiecringServices.asp <br />Consultant Responsibilities: <br />�CgnSUltant Audit and Review Process: Prior to awarding the contract, the selected Consultant <br />shall be subject to an audit or review by Caltrans' Audits and Investigations (A&I), other state <br />audit organizations, or the federal government. The selected Consultant shall complete Exhibit <br />10-K — Consultant Certification Contract Costs and Financial, in the Appendix of this RFP as <br />Attachment 4. <br />City Responsibilities: <br />1. Furnish construction plans and speclf cations to the consultant. <br />2. Coordinate with the contractor regarding work schedule and notify the consultant 24 hours in <br />advance for the required inspections and tests. <br />Fee Proposal: <br />In addition to Section 111,13.3 (Submittal Requirements: Pee Proposal) fee schedule shall be <br />structured as follows: <br />• For Caltrans funded projects, reference LAPM Exhibit 10-H (sample cost proposal) and is <br />include in Attachment 4. <br />City of Santa Ana RFP 15 <br />Page Al -3 <br />