My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH - AMEND ZONING 2001 W MACARTHUR
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2017
>
10/03/2017
>
75B - PH - AMEND ZONING 2001 W MACARTHUR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2017 5:09:37 PM
Creation date
9/28/2017 4:44:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
10/3/2017
Destruction Year
2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENVIRONMENTAL 19rAOT REPORT ADDENDUM AMMSTNONO RANCH REVISED PROJECT <br />SEPTEYSER 9017 SANTA ANA. CALIEOCNIA <br />of p'rev'iously proposed intersection improvements shows that.all iutersectioti.iniproyemeius <br />recommended for the Future Year (2111)7) conditions have been implemented by 201.6 except it <br />the intersection of Bristol Street/Segerstrom Avenue. The Arnistrong Ranch Developihent Project <br />EIR had anticipated that this intersectionwould operate at an unsatisfactory level of service in the <br />without project condition due to anticipated cumulative projects. <br />A Traffic Impact' Analysis (LSA, 20 17) was prepared analyzing the Revised Project in the <br />existing (2,017) apd,opening year (2019) conditions. The Traffic Impact Analysis concluded that <br />the additiona142.residential 'units proposed as.part of the Revised Project would notsigniticantly <br />impact the nearby circulation system. All stud} area intersections would eontinue to operate at a <br />satisftictorys Level of Service inboth-the a.m. and p.m, peak hours with the additioiial project - <br />related trdffic. `1776 access driveway to the additional residences would also not interfere with the <br />arterial street system. Therefore, operational traffic impacts would be less than significant. <br />Therefore, the Revised Project would not result in new signiheant impacts beyond those <br />identified in the Certified EIR: No neve mitigation measures would be required. <br />b) The Armstrong;Ranch Development Project EIA reported that the trips generation, for the -project <br />was lower than the threshold for analysis according to the Orange, Count} Congestion <br />Managenfebt P6grarn guidelines. The p'roject's effect wits therefore dclermined to bvIcss than <br />significant. As reported above, the Revised Project would generale rewer trips within the project <br />area than the uses included in the Armstrong Ranch Development Project EiR. Because the <br />project would produce fewer trips, the trip generation would still be lower than the threshold for <br />analysis according to the Orange County Congestion Management Program guidelines and the <br />impact would continue to be less than; significant, Therefore, the Revised Project would not result <br />in new significant impacts beyond those identified in the Certified EIR. No new nritigation <br />measures would be required, <br />c) The Revised Project is located in the same project area and does not increase building height <br />cotnpared to the project analyzed in the Armstrong Ranch Development Project 81R. Therefore <br />the Revised Project is not expected to change the previous conclusion that there would be no <br />impact to air triflic patterns resulting in substnntinl safety risks.'llterefore, the Revised -Project <br />would not resuh in new_signific tut impacts beyond those identiFed in the Certified'EIR. No new <br />mitigation measures would be required. <br />d) Similar to the previously analyzed project, the Revised Project proposes standard design features <br />includm,;'an ttoccss driveway from the Jaguar Way cul-de-sac, utilization of theexistingsouth leg <br />or the Jaguar Way/Alton Avenue intersection, and a riglit-iniright-out driveway on Alton Avenue. <br />internal to the project, an existing non-standard intersection between the parish parking lot and <br />YNTCA parking lot would be replaced with a more standard,roundabout resulting, in reduced <br />vehicle conflicts. Thu use of standard features would result in a less thansitmdficant increase in <br />hazards due to design features. Therefore, the Revised Project would not result in new significant <br />impacts' beyond those identified in the Certified EIR. No new mitigation measures would be <br />required <br />c) The Revised Project proposes an access driveway from the Jagintit Way cul-de-sac, utilization of <br />the existing south lug of the Jaguar Way/Alton Avenue intersection, and it right-iii/right-out <br />driveway on Alton Avenue, which should provide adequate emergency access and would provide <br />P;1511C11bM1Addendum'•ilddemlum.dacx<J)W i;lbl <br />75B-116 <br />2-G7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.